Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
03/29/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301460 T21-M0072 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-0324-00272
Permit Status: Issued
Permit Description: SFR MER1301460 T21-M0072 REV1 roof covering change
Start Date Submittal Complete Date Status  
04/01/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/08/2024 APPROVED Review Details
08/23/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/23/2024 APPROVED Review Details
11/15/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/18/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0324-00272
Permit Status: Issued
Permit Description: SFR MER1301460 T21-M0072 REV1 roof covering change
Date Description Comments
04/03/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/03/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/03/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/03/2024 Post-Tension Inspection Report is required.
03/05/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/05/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/03/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0324-00272
Permit Description: SFR MER1301460 T21-M0072 REV1 roof covering change
Total Completed Inspections - 21
Date Description Inspector Results Comments
06/13/2024 COT - RSPL - Yard Water Line Passed
06/13/2024 COT - RSPL - Sewer Passed
06/13/2024 COT - RSPL - Rough Soil Passed
06/27/2024 COT - RSBU - Preslab Passed
06/27/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
06/27/2024 COT - RSEL - Grounding/Bonding Passed
06/27/2024 COT - RSEL - Electrical Underground Passed
07/16/2024 COT - RSBU - Exterior Clips/Sheathing Passed
07/16/2024 COT - RSBU - Roof Nailing Passed
08/16/2024 BULD - Electrical Clearance Passed Okay to install meter and energize panel. ECO Clearance issued for 95 N Spring Flower Dr to TEP.
08/16/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall.
08/16/2024 COT - RSPL - Gas Pressure Test Passed Gas line is under 15 psi of air pressure with no leaks. Okay to proceed.
08/28/2024 COT - RSBU - Interior Shear Bracing Passed Drywall is properly secured to studs per plan for a sheet rock interior shear wall. Okay to proceed with tape, texture, and paint.
10/08/2024 COT - BULD - SWG Clearance Passed SWG for meter only
11/01/2024 COT - RSEL - Electrical Final Passed
11/01/2024 COT - RSEL - Outdoor Lighting Passed
11/01/2024 COT - RSME - Mechanical Final Passed
11/01/2024 COT - RSPL - Plumbing Final Passed
11/01/2024 ENGR Engineering Final Passed
11/01/2024 RSBU - Building Final Passed
11/01/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
148475 PT LOT 196 COMPLETE-2024-08-20_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 196 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 196 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 196 SPECIAL INSPECTION CERTIFICATE-2024-03-29_V1.PDF DOCUMENTS VIEW