Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
03/30/2023
Applicant:
Description:
SFR DRHOH30K21 T21-M0046

Permit Reviews

Permit Number - TC-MDP-0323-00819
Permit Status: Complete
Permit Description: SFR DRHOH30K21 T21-M0046
Start Date Submittal Complete Date Status  
04/06/2023 RESIDENTIAL NEW DWELLING v.1 04/11/2023 APPROVED Review Details
08/03/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/10/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0323-00819
Permit Status: Complete
Permit Description: SFR DRHOH30K21 T21-M0046
Date Description Comments
04/06/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/06/2023 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
04/06/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/06/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
04/10/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0323-00819
Permite Description: SFR DRHOH30K21 T21-M0046
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
06/20/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Canceled Canceled per contractor 6/20/2023
06/20/2023 COT - RSPL - Gas Pressure Test N/A Canceled Canceled per contractor 6/20/2023

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0323-00819
Permit Description: SFR DRHOH30K21 T21-M0046
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/05/2023 COT - RSPL - Rough Soil Passed
05/05/2023 COT - RSPL - Sewer Passed
05/05/2023 COT - RSPL - Yard Water Line Passed
05/12/2023 COT - RSBU - Preslab Passed
05/12/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
05/12/2023 COT - RSEL - Electrical Underground Passed
05/12/2023 COT - RSEL - Grounding/Bonding Passed
06/08/2023 COT - RSBU - Roof Nailing Passed
06/08/2023 COT - RSBU - Exterior Clips/Sheathing Passed
07/03/2023 COT - RSBU - Interior Shear Bracing Passed
08/14/2023 BULD - Electrical Clearance Passed TEP ECO
08/18/2023 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 8/18/2023
08/25/2023 RSBU - Building Progress Passed
08/25/2023 COT - RSEL - Outdoor Lighting Passed
08/25/2023 COT - RSME - Mechanical Final Passed
08/25/2023 COT - RSPL - Gas Final Passed
08/25/2023 COT - RSPL - Plumbing Final Passed
08/28/2023 RSBU - Building Final Passed Corrections were made. 8/28/2023
08/28/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Duplicate inspection. 8/28/2023
08/28/2023 COT - RSEL - Electrical Final Passed Corrections were made. 8/28/2023
08/28/2023 COT - RSPL - Gas Pressure Test Passed Duplicate inspection. 8/28/2023

Documents

File Name Document Type  
SVB 40 PT REPORT-2023-08-02_V1.PDF DOCUMENTS VIEW
SVB 40 SIC-2023-08-02_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-SVB 40 D1_V1.PDF DOCUMENTS VIEW
SVB 40 SIC-2023-03-30_V1.PDF DOCUMENTS VIEW