Permit: TC-MDP-0323-00818
Permit Details
Apply Date:
03/30/2023
Applicant:
Description:
SFR DRHOH35B21 T21-M0045
Permit Reviews
Permit Number - TC-MDP-0323-00818
Permit Status: Complete
Permit Description: SFR DRHOH35B21 T21-M0045
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/05/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 04/11/2023 | APPROVED |
06/14/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | N/A | IN REVIEW |
Outstanding Activity Conditions
Permit Number - TC-MDP-0323-00818
Permit Status: Complete
Permit Description: SFR DRHOH35B21 T21-M0045
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
04/10/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. |
04/10/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
04/10/2023 | Post-Installed Anchor Inspection Report is required. |
04/10/2023 | Soil Tests |
04/10/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0323-00818
Permit Description: SFR DRHOH35B21 T21-M0045
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/28/2023 | COT - RSBU - Preslab | Passed | ||
04/28/2023 | COT - RSEL - Electrical Underground | Passed | ||
04/28/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
04/28/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
04/28/2023 | COT - RSPL - Rough Soil | Passed | ||
04/28/2023 | COT - RSPL - Sewer | Passed | ||
04/28/2023 | COT - RSPL - Yard Water Line | Passed | ||
05/22/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | Approved. 5/22/2023 | |
05/22/2023 | COT - RSBU - Roof Nailing | Passed | Approved. 5/22/2023 | |
06/05/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 6/5/23: passed | |
06/05/2023 | COT - RSPL - Gas Pressure Test | Passed | Canceled per contractor 6/2/2023 6/5/23: passed |
|
06/12/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
07/10/2023 | BULD - Electrical Clearance | Passed | Approved, ECO Clearance to TEP is required for construction power | |
08/03/2023 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
08/08/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
08/08/2023 | COT - RSPL - Plumbing Final | Passed | ||
08/08/2023 | RSBU - Building Progress | Passed | ||
08/10/2023 | COT - RSEL - Electrical Final | Passed | Approved corrections were made. 8/10/2023 | |
08/10/2023 | COT - RSME - Mechanical Final | Passed | Approved corrections were made. 8/10/2023 | |
08/10/2023 | RSBU - Building Final | Passed | Approved corrections were made. 8/10/2023 | |
08/10/2023 | ENGR Engineering Final | Passed |