Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
03/30/2023
Applicant:
Description:
SFR DRHOH35B21 T21-M0045

Permit Reviews

Permit Number - TC-MDP-0323-00818
Permit Status: Complete
Permit Description: SFR DRHOH35B21 T21-M0045
Start Date Submittal Complete Date Status  
04/05/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 04/11/2023 APPROVED Review Details
06/14/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0323-00818
Permit Status: Complete
Permit Description: SFR DRHOH35B21 T21-M0045
Total Outstanding Activity Conditions - 5
Date Name
04/10/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
04/10/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/10/2023 Post-Installed Anchor Inspection Report is required.
04/10/2023 Soil Tests
04/10/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0323-00818
Permit Description: SFR DRHOH35B21 T21-M0045
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/28/2023 COT - RSBU - Preslab Passed
04/28/2023 COT - RSEL - Electrical Underground Passed
04/28/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
04/28/2023 COT - RSEL - Grounding/Bonding Passed
04/28/2023 COT - RSPL - Rough Soil Passed
04/28/2023 COT - RSPL - Sewer Passed
04/28/2023 COT - RSPL - Yard Water Line Passed
05/22/2023 COT - RSBU - Exterior Clips/Sheathing Passed Approved. 5/22/2023
05/22/2023 COT - RSBU - Roof Nailing Passed Approved. 5/22/2023
06/05/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 6/5/23: passed
06/05/2023 COT - RSPL - Gas Pressure Test Passed Canceled per contractor 6/2/2023

6/5/23: passed
06/12/2023 COT - RSBU - Interior Shear Bracing Passed
07/10/2023 BULD - Electrical Clearance Passed Approved, ECO Clearance to TEP is required for construction power
08/03/2023 COT - BULD - SWG Clearance Passed SWG for meter only
08/08/2023 COT - RSEL - Outdoor Lighting Passed
08/08/2023 COT - RSPL - Plumbing Final Passed
08/08/2023 RSBU - Building Progress Passed
08/10/2023 COT - RSEL - Electrical Final Passed Approved corrections were made. 8/10/2023
08/10/2023 COT - RSME - Mechanical Final Passed Approved corrections were made. 8/10/2023
08/10/2023 RSBU - Building Final Passed Approved corrections were made. 8/10/2023
08/10/2023 ENGR Engineering Final Passed