Permit: TC-MDP-0323-00813
Permit Details
Apply Date:
03/29/2023
Applicant:
Mark Alteri
Description:
PVCS1500 T22-M0040 SFR
Permit Reviews
Permit Number - TC-MDP-0323-00813
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/16/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/22/2023 | APPROVED |
04/04/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 04/10/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0323-00813
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
04/10/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0323-00813
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Date | Description | Comments |
---|---|---|
04/04/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0323-00813
Permit Description: PVCS1500 T22-M0040 SFR
Total Completed Inspections - 18
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/28/2023 | COT - RSPL - Rough Soil | Passed | ||
04/28/2023 | COT - RSPL - Sewer | Passed | ||
04/28/2023 | COT - RSPL - Yard Water Line | Passed | ||
05/03/2023 | COT - RSEL - Grounding/Bonding | Passed | Ufer ground is in place. | |
05/03/2023 | COT - RSBU - Preslab | Passed | Rebar reinforcement is in place for shear wall hold downs. Post-tension cable is in place. Okay to pour concrete slab. | |
05/03/2023 | COT - RSEL - Electrical Underground | Passed | Kitchen doesn't have an island. No underslab electrical needed. | |
05/03/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar reinforcement is in place for shear wall hold downs. Post-tension cable is in place. | |
05/19/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
05/19/2023 | COT - RSBU - Roof Nailing | Passed | ||
06/08/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
06/09/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
07/11/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
08/29/2023 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
08/29/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
09/18/2023 | COT - RSEL - Electrical Final | Passed | ||
09/18/2023 | COT - RSME - Mechanical Final | Passed | ||
09/18/2023 | COT - RSPL - Plumbing Final | Passed | ||
09/18/2023 | RSBU - Building Final | Passed |