Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
03/29/2023
Applicant:
Mark Alteri
Description:
PVCS1500 T22-M0040 SFR

Permit Reviews

Permit Number - TC-MDP-0323-00813
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Start Date Submittal Complete Date Status  
06/16/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/22/2023 APPROVED Review Details
04/04/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 04/10/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0323-00813
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Total Outstanding Activity Conditions - 1
Date Name
04/10/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0323-00813
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Date Description Comments
04/04/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0323-00813
Permit Description: PVCS1500 T22-M0040 SFR
Total Completed Inspections - 18
Date Description Inspector Results Comments
04/28/2023 COT - RSPL - Rough Soil Passed
04/28/2023 COT - RSPL - Sewer Passed
04/28/2023 COT - RSPL - Yard Water Line Passed
05/03/2023 COT - RSEL - Grounding/Bonding Passed Ufer ground is in place.
05/03/2023 COT - RSBU - Preslab Passed Rebar reinforcement is in place for shear wall hold downs. Post-tension cable is in place. Okay to pour concrete slab.
05/03/2023 COT - RSEL - Electrical Underground Passed Kitchen doesn't have an island. No underslab electrical needed.
05/03/2023 COT - RSBU - Excavation/Rebar/Zoning Passed Rebar reinforcement is in place for shear wall hold downs. Post-tension cable is in place.
05/19/2023 COT - RSBU - Exterior Clips/Sheathing Passed
05/19/2023 COT - RSBU - Roof Nailing Passed
06/08/2023 BULD - Electrical Clearance Passed TEP ECO
06/09/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/11/2023 COT - RSBU - Interior Shear Bracing Passed
08/29/2023 COT - BULD - SWG Clearance Passed SWG for meter only
08/29/2023 COT - RSPL - Gas Pressure Test Passed
09/18/2023 COT - RSEL - Electrical Final Passed
09/18/2023 COT - RSME - Mechanical Final Passed
09/18/2023 COT - RSPL - Plumbing Final Passed
09/18/2023 RSBU - Building Final Passed

Documents

File Name Document Type  
PT REPORT LOT 3-2023-06-15_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 3 1500 PP FOR PERMIT_V1.PDF DOCUMENTS VIEW
CBT LOT 3 PT CERT-2023-03-29_V1.PDF DOCUMENTS VIEW