Permit: TC-MDP-0323-00807
Permit Details
Apply Date:
02/06/2024
Applicant:
Celina Rodriguez
Description:
SFR BT2191-30 T22-M0009
Permit Reviews
Permit Number - TC-MDP-0323-00807
Permit Status: Inspections complete
Permit Description: SFR BT2191-30 T22-M0009
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/06/2024 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 02/27/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0323-00807
Permit Status: Inspections complete
Permit Description: SFR BT2191-30 T22-M0009
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
02/06/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
02/06/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
02/06/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
02/23/2024 | Post-Tension Inspection Report is required. |
02/23/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
11/22/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0323-00807
Permit Status: Inspections complete
Permit Description: SFR BT2191-30 T22-M0009
Date | Description | Comments |
---|---|---|
02/06/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
03/22/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
11/22/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0323-00807
Permite Description: SFR BT2191-30 T22-M0009
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/25/2024 | COT - RSEL - Electrical Underground | N/A | Not Applicable | Not required on this model, kitchen has a peninsula counter not an island counter. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0323-00807
Permit Description: SFR BT2191-30 T22-M0009
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/14/2024 | COT - RSPL - Yard Water Line | Passed | ||
03/14/2024 | COT - RSPL - Rough Soil | Passed | ||
03/25/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, footing is properly dug, rebar reinforcement is in place per plans, post tension cabling is installed per plans, and Ufer ground is installed in footing. Okay to pour concrete for footings and slab on grade. | |
03/25/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, footing is properly dug, rebar reinforcement is in place per plans, post tension cabling is installed per plans, and Ufer ground is installed in footing. Okay to pour concrete for footings and slab on grade. | |
03/25/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, footing is properly dug, rebar reinforcement is in place per plans, post tension cabling is installed per plans, and Ufer ground is installed in footing. Okay to pour concrete for footings and slab on grade. | |
04/12/2024 | COT - RSBU - Roof Nailing | Passed | ||
04/15/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
05/14/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
05/14/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
06/17/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall for interior shear walls is properly installed and secured to the studs per plan requirements. Okay to proceed with tape, texture, and paint of walls and ceiling. | |
07/24/2024 | COT - RSPL - Sewer | Passed | 7/24/24: Underground plumbing is properly connected to sewer line and is under a water test with no leaks. Okay to shade pipe and backfill trench. | |
07/24/2024 | BULD - Electrical Clearance | Passed | Okay to energize panel. ECO Clearance issued to TEP for 9117 E. Red Bluff Ct. | |
08/27/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
09/09/2024 | COT - RSEL - Electrical Final | Passed | 9/9/24: Construction is complete. Okay to issue Certificate of Occupancy. | |
09/09/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is fully operational and installed per plans and city regulations. | |
09/09/2024 | COT - RSME - Mechanical Final | Passed | 9/9/24: Construction is complete. Okay to issue Certificate of Occupancy. | |
09/09/2024 | COT - RSPL - Plumbing Final | Passed | 9/9/24: Construction is complete. Okay to issue Certificate of Occupancy. | |
09/09/2024 | ENGR Engineering Final | Passed | Move in ready | |
09/09/2024 | RSBU - Building Final | Passed | 9/9/24: Construction is complete. Okay to issue Certificate of Occupancy. | |
09/10/2024 | RSBU - Building Progress | Passed | 9/9/24: Construction is complete. Okay to issue Certificate of Occupancy. |