Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
9108 E WHITE BLUFF CT
Apply Date:
10/29/2023
Applicant:
Celina Rodriguez
Description:
SFR BT2685-228 T22-M0012

Permit Reviews

Permit Number - TC-MDP-0323-00803
Permit Status: Inspections complete
Permit Description: SFR BT2685-228 T22-M0012
Start Date Submittal Complete Date Status  
10/31/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 11/19/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0323-00803
Permit Status: Inspections complete
Permit Description: SFR BT2685-228 T22-M0012
Total Outstanding Activity Conditions - 4
Date Name
10/31/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/01/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/01/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/01/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0323-00803
Permit Status: Inspections complete
Permit Description: SFR BT2685-228 T22-M0012
Date Description Comments
10/31/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
03/22/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0323-00803
Permite Description: SFR BT2685-228 T22-M0012
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/27/2024 COT - RSEL - Grounding/Bonding N/A Partial Pass Concrete forms are set, post tension cabling is in place and properly spaced, masa clips and shear wall hold downs are installed on forms as required, underground plumbing pipes are properly wrapped with foam, underground electrical for kitchen island is installed, and Ufer ground is in place on transformer side of garage. Okay to pour concrete.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0323-00803
Permit Description: SFR BT2685-228 T22-M0012
Total Completed Inspections - 21
Date Description Inspector Results Comments
11/21/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading is required. 11/21/2024
11/21/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading is required. 11/21/2024
11/21/2024 COT - RSPL - Yard Water Line Passed 60psi air test approved. Okay to backfill. Shading required. 11/21/2024
11/27/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is in place and properly spaced, masa clips and shear wall hold downs are installed on forms as required, underground plumbing pipes are properly wrapped with foam, underground electrical for kitchen island is installed, and Ufer ground is in place on transformer side of garage. Okay to pour concrete.
11/27/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is in place and properly spaced, masa clips and shear wall hold downs are installed on forms as required, underground plumbing pipes are properly wrapped with foam, underground electrical for kitchen island is installed, and Ufer ground is in place on transformer side of garage. Okay to pour concrete.
11/27/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is in place and properly spaced, masa clips and shear wall hold downs are installed on forms as required, underground plumbing pipes are properly wrapped with foam, underground electrical for kitchen island is installed, and Ufer ground is in place on transformer side of garage. Okay to pour concrete.
12/20/2024 COT - RSBU - Roof Nailing Passed 12/20/24 corrections made
12/20/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 12/20/24 corrections made
01/22/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1/22/25 pass
01/22/2025 COT - RSPL - Gas Pressure Test Passed 1/22/25 pass
02/06/2025 COT - RSBU - Interior Shear Bracing Passed 2-6-25, shear wall bracing inspection approved plans. Okay for tape & texture.
02/20/2025 COT - RSEL - Grounding/Bonding Passed 2/20/25 pass
02/20/2025 BULD - Electrical Clearance Passed 2/20/25 approval for TEP ECO
03/19/2025 COT - BULD - SWG Clearance Passed Passed clearance SWG 3/19/25
04/04/2025 COT - RSEL - Electrical Final Passed Passed final 4/4/25 CLEARANCE ECO
04/04/2025 COT - RSEL - Outdoor Lighting Passed Passed final 4/4/25
04/04/2025 COT - RSME - Mechanical Final Passed Passed final 4/4/25
04/04/2025 COT - RSPL - Plumbing Final Passed Passed final 4/4/25
04/04/2025 RSBU - Building Final Passed Passed final 4/4/25
04/04/2025 RSBU - Building Progress Passed Passed final 4/4/25
04/08/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 13 START 2_V1.PDF DOCUMENTS VIEW
BTIII 13 SIC-2024-10-29_V1.PDF DOCUMENTS VIEW