Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
03/22/2023
Applicant:
Description:
SFR DRHOH30M21 T21-M0041

Permit Reviews

Permit Number - TC-MDP-0323-00800
Permit Status: Complete
Permit Description: SFR DRHOH30M21 T21-M0041
Start Date Submittal Complete Date Status  
06/28/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 06/28/2023 APPROVED Review Details
03/24/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 03/29/2023 APPROVED Review Details
06/14/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/23/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0323-00800
Permit Status: Complete
Permit Description: SFR DRHOH30M21 T21-M0041
Total Outstanding Activity Conditions - 2
Date Name
03/29/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
03/29/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0323-00800
Permit Status: Complete
Permit Description: SFR DRHOH30M21 T21-M0041
Date Description Comments
06/22/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/22/2023 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
03/29/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/22/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/29/2023 Soil Tests

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0323-00800
Permit Description: SFR DRHOH30M21 T21-M0041
Total Completed Inspections - 20
Date Description Inspector Results Comments
05/04/2023 COT - RSPL - Rough Soil Passed Approved. Okay to backfill. Shading required. 5/4/2023
05/04/2023 COT - RSPL - Sewer Passed Approved. Okay to backfill. Shading required. 5/4/2023
05/04/2023 COT - RSPL - Yard Water Line Passed Approved. Okay to backfill. Shading required. 5/4/2023
05/12/2023 COT - RSEL - Grounding/Bonding Passed
05/12/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
05/12/2023 COT - RSBU - Preslab Passed
05/12/2023 COT - RSEL - Electrical Underground Passed
05/18/2023 BULD - Electrical Clearance Passed Clearance for TEP ECO. 5/18/2023
06/07/2023 COT - RSBU - Roof Nailing Passed
06/07/2023 COT - RSBU - Exterior Clips/Sheathing Passed
06/15/2023 COT - RSPL - Gas Pressure Test Passed
06/16/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Approved. Corrections were made. 6/16/2023
06/23/2023 COT - RSBU - Interior Shear Bracing Passed
08/18/2023 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 8/18/2023
08/18/2023 COT - RSEL - Electrical Final Passed
08/18/2023 COT - RSEL - Outdoor Lighting Passed
08/18/2023 COT - RSME - Mechanical Final Passed
08/18/2023 COT - RSPL - Plumbing Final Passed
08/18/2023 RSBU - Building Progress Passed
08/23/2023 RSBU - Building Final Passed

Documents

File Name Document Type  
SVB 39 PT REPORT-2023-06-09_V1.PDF DOCUMENTS VIEW
SVB 39 SIC-2023-06-09_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-SVB 39 D1_V1.PDF DOCUMENTS VIEW
SVB 39 SIC-2023-03-22_V1.PDF DOCUMENTS VIEW