Permit: TC-MDP-0323-00798
Permit Details
Apply Date:
03/23/2023
Applicant:
Mark Alteri
Description:
SFR CVPLAN3 T22-M0044
Permit Reviews
Permit Number - TC-MDP-0323-00798
Permit Status: Complete
Permit Description: SFR CVPLAN3 T22-M0044
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/16/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/22/2023 | APPROVED |
03/24/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 03/31/2023 | REQUIRES RESUBMIT |
04/10/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.2 | 04/14/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0323-00798
Permit Status: Complete
Permit Description: SFR CVPLAN3 T22-M0044
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
03/29/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. |
03/29/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0323-00798
Permit Status: Complete
Permit Description: SFR CVPLAN3 T22-M0044
Date | Description | Comments |
---|---|---|
03/29/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
06/22/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0323-00798
Permit Description: SFR CVPLAN3 T22-M0044
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/28/2023 | COT - RSPL - Yard Water Line | Passed | ||
04/28/2023 | COT - RSPL - Sewer | Passed | ||
04/28/2023 | COT - RSPL - Rough Soil | Passed | ||
05/03/2023 | COT - RSBU - Preslab | Passed | Rebar reinforcement is in place for shear wall hold downs. Post-tension cable is in place. Okay to pour concrete slab. | |
05/03/2023 | COT - RSEL - Electrical Underground | Passed | Kitchen island conduit is in place. | |
05/03/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar reinforcement is in place for shear wall hold downs. Post-tension cable is in place. | |
05/03/2023 | COT - RSEL - Grounding/Bonding | Passed | Ufer ground is in place. | |
05/25/2023 | COT - RSBU - Roof Nailing | Passed | ||
05/26/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
07/11/2023 | BULD - Electrical Clearance | Passed | Approved, ECO Clearance to TEP is required for the construction power | |
07/18/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
07/18/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
08/10/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
10/05/2023 | RSBU - Building Progress | Passed | ||
10/05/2023 | COT - RSPL - Backwater Valve | Passed | ||
10/05/2023 | COT - RSME - Mechanical Final | Passed | ||
10/05/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
10/05/2023 | COT - RSEL - Electrical Final | Passed | ||
10/05/2023 | COT - BULD - SWG Clearance | Passed | SWG FOR METER ONLY | |
10/09/2023 | COT - RSPL - Plumbing Final | Passed | ||
10/09/2023 | RSBU - Building Final | Passed |