Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
03/26/2023
Applicant:
John Hodge
Description:
SFR PULT3515-3 T21-M0047

Permit Reviews

Permit Number - TC-MDP-0323-00796
Permit Status: Complete
Permit Description: SFR PULT3515-3 T21-M0047
Start Date Submittal Complete Date Status  
03/30/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 04/05/2023 REQUIRES RESUBMIT Review Details
04/11/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.2 04/13/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0323-00796
Permit Status: Complete
Permit Description: SFR PULT3515-3 T21-M0047
Total Outstanding Activity Conditions - 5
Date Name
03/30/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/30/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/30/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
04/04/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
04/04/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0323-00796
Permit Status: Complete
Permit Description: SFR PULT3515-3 T21-M0047
Date Description Comments
03/30/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0323-00796
Permit Description: SFR PULT3515-3 T21-M0047
Total Completed Inspections - 20
Date Description Inspector Results Comments
05/04/2023 COT - RSPL - Yard Water Line Passed
05/04/2023 COT - RSPL - Sewer Passed
05/04/2023 COT - RSPL - Rough Soil Passed
05/10/2023 COT - RSBU - Preslab Passed
05/10/2023 COT - RSEL - Electrical Underground Passed
05/10/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
05/23/2023 COT - RSBU - Roof Nailing Passed
05/23/2023 COT - RSBU - Exterior Clips/Sheathing Passed
06/15/2023 COT - RSEL - Grounding/Bonding Passed
06/15/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed move smoke detector three feet from bathroom door.
06/15/2023 COT - RSPL - Gas Pressure Test Passed
07/05/2023 COT - RSBU - Interior Shear Bracing Passed
07/10/2023 BULD - Electrical Clearance Passed 7-10-23: Address tag has been installed on electrical panel. ECO Clearance issued. Okay to energize electric panel.
08/17/2023 COT - BULD - SWG Clearance Passed Swg clearance for meter only.
09/06/2023 COT - RSME - Mechanical Final Passed
09/06/2023 RSBU - Building Final Passed
09/06/2023 COT - RSEL - Outdoor Lighting Passed
09/06/2023 COT - RSPL - Plumbing Final Passed
09/06/2023 RSBU - Building Progress Passed
09/06/2023 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
7585 - LE LOT 05604 - SIC-2023-03-26_V1.PDF DOCUMENTS VIEW
LE 05604_V1.PDF DOCUMENTS VIEW