Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
07/16/2023
Applicant:
John Hodge
Description:
SFR PULT3513-2 T21-M0056

Permit Reviews

Permit Number - TC-MDP-0323-00791
Permit Status: Inspections complete
Permit Description: SFR PULT3513-2 T21-M0056
Start Date Submittal Complete Date Status  
07/17/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 07/18/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0323-00791
Permit Status: Inspections complete
Permit Description: SFR PULT3513-2 T21-M0056
Total Outstanding Activity Conditions - 4
Date Name
07/17/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/17/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/17/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
07/17/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0323-00791
Permit Status: Inspections complete
Permit Description: SFR PULT3513-2 T21-M0056
Date Description Comments
07/17/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0323-00791
Permite Description: SFR PULT3513-2 T21-M0056
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/08/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required loose anchor bolts, tighten anchor bolts throughout, fix top plate right side of garage for range hood vent, block duct registers on three sides, staple wire needed at laundry, leak at bathroom tub, open chase back of house right side, add nails to plates for water lines back of house.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0323-00791
Permit Description: SFR PULT3513-2 T21-M0056
Total Completed Inspections - 21
Date Description Inspector Results Comments
10/17/2023 COT - RSPL - Rough Soil Passed Okay to backfill. Shading is required. 10/17/2023
10/17/2023 COT - RSPL - Sewer Passed Okay to backfill. Shading is required. 10/17/2023
10/17/2023 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading is required. 10/17/2023
10/20/2023 COT - RSBU - Preslab Passed
10/20/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
10/20/2023 COT - RSEL - Electrical Underground Passed
10/20/2023 COT - RSEL - Grounding/Bonding Passed
11/07/2023 COT - RSBU - Roof Nailing Passed
11/07/2023 COT - RSBU - Exterior Clips/Sheathing Passed
12/08/2023 BULD - Electrical Clearance Passed
12/08/2023 RSBU - Building Progress Passed
12/08/2023 COT - RSPL - Gas Pressure Test Passed
12/11/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/21/2023 COT - RSBU - Interior Shear Bracing Passed
03/14/2024 COT - BULD - SWG Clearance Passed
03/14/2024 COT - RSEL - Electrical Final Passed
03/14/2024 COT - RSEL - Outdoor Lighting Passed
03/14/2024 COT - RSME - Mechanical Final Passed
03/14/2024 COT - RSPL - Plumbing Final Passed
03/14/2024 ENGR Engineering Final Passed Cut the pipes down to cap at grade in the front yard, last time I’ll pass one that isn’t completed.
03/15/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
7585 - LE LOT 07004 - SIC-2023-07-16_V1.PDF DOCUMENTS VIEW
LE 07004_V1.PDF DOCUMENTS VIEW