Permit: TC-MDP-0323-00781
Permit Details
Apply Date:
03/24/2023
Applicant:
Joshua Swinney
Description:
SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8
Permit Reviews
Permit Number - TC-MDP-0323-00781
Permit Status: Complete
Permit Description: SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/09/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/13/2023 | APPROVED |
04/13/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.3 | 04/19/2023 | APPROVED |
05/17/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 05/23/2023 | APPROVED |
05/08/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 05/12/2023 | APPROVED |
04/05/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.2 | 04/11/2023 | REQUIRES RESUBMIT |
03/28/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 03/28/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0323-00781
Permit Status: Complete
Permit Description: SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8
Date | Description | Comments |
---|---|---|
12/22/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
12/22/2022 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0323-00781
Permite Description: SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/08/2023 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
11/08/2023 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0323-00781
Permit Description: SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/22/2023 | COT - RSPL - Yard Water Line | Passed | ||
05/22/2023 | COT - RSPL - Rough Soil | Passed | ||
05/30/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
05/30/2023 | COT - RSBU - Preslab | Passed | ||
05/30/2023 | COT - RSEL - Electrical Underground | Passed | ||
05/30/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/22/2023 | COT - RSBU - Roof Nailing | Passed | ||
06/22/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
07/25/2023 | BULD - Electrical Clearance | Passed | ||
07/28/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
08/10/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
08/17/2023 | COT - RSPL - Sewer | Passed | ||
11/17/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
11/17/2023 | COT - RSPL - Plumbing Final | Passed | ||
11/17/2023 | RSBU - Building Progress | Passed | ||
11/17/2023 | RSBU - Building Final | Passed | Missing outlet receptacles at back porch and hallway second floor, refrigerant line for a/c must be wrapped in UV rated tape. | |
11/17/2023 | COT - RSEL - Electrical Final | Passed | Missing outlet receptacles at back porch and hallway second floor, refrigerant line for a/c must be wrapped in UV rated tape. | |
11/17/2023 | COT - RSME - Mechanical Final | Passed | Missing outlet receptacles at back porch and hallway second floor, refrigerant line for a/c must be wrapped in UV rated tape. | |
11/20/2023 | ENGR Engineering Final | Passed |