Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
12/06/2022
Applicant:
Joshua Swinney
Description:
SFR 500 Coolidge Model Plan La Estancia Blocks 6, 7, and 8

Permit Reviews

Permit Number - TC-MDP-0323-00759
Permit Status: Complete
Permit Description: SFR 500 Coolidge Model Plan La Estancia Blocks 6, 7, and 8
Start Date Submittal Complete Date Status  
10/11/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/14/2024 APPROVED Review Details
03/20/2024 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 03/27/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0323-00759
Permit Status: Complete
Permit Description: SFR 500 Coolidge Model Plan La Estancia Blocks 6, 7, and 8
Date Description Comments
03/22/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
12/21/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/20/2024 Post-Tension Inspection Report is required.
03/17/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
12/21/2022 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0323-00759
Permite Description: SFR 500 Coolidge Model Plan La Estancia Blocks 6, 7, and 8
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
05/31/2024 COT - BULD - SWG Clearance N/A Not Applicable
11/14/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable Not applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0323-00759
Permit Description: SFR 500 Coolidge Model Plan La Estancia Blocks 6, 7, and 8
Total Completed Inspections - 19
Date Description Inspector Results Comments
05/21/2024 COT - RSPL - Rough Soil Passed
05/21/2024 COT - RSPL - Sewer Passed
05/31/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
05/31/2024 COT - RSBU - Preslab Passed
05/31/2024 COT - RSEL - Electrical Underground Passed
07/22/2024 COT - RSBU - Roof Nailing Passed Corrections were made. 7/22/2024
07/22/2024 COT - RSBU - Exterior Clips/Sheathing Passed Corrections were made. 7/22/2024
09/04/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Corrections were made. 9/4/2024
09/26/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO 9/26/024
11/14/2024 COT - RSEL - Grounding/Bonding Passed 11-14-24, approved
11/14/2024 COT - RSEL - Outdoor Lighting Passed 11-14-24, outdoor lighting approved.
11/14/2024 COT - RSME - Mechanical Final Passed 11-14-24, mechanical final approved.
11/14/2024 COT - RSPL - Yard Water Line Passed 11-14-24, approved
11/14/2024 COT - RSBU - Interior Shear Bracing Passed 11-15-24, interior shear bracing was previously inspected and approved
11/14/2024 RSBU - Building Progress Passed
11/14/2024 ENGR Engineering Final Passed CO Ready
11/18/2024 COT - RSPL - Plumbing Final Passed
11/21/2024 COT - RSEL - Electrical Final Passed 11-21-24, verified corrections. Electrical final approved.
11/21/2024 RSBU - Building Final Passed 11-21-24, verified corrections. Building final approved.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LA ESTANCIA DE TUCSON PHASE II BELLA VITA - PARCEL 6 FINAL SIC - LOT 6027-2024-10-10_V1.PDF DOCUMENTS VIEW
Z500 COOLIDGE- TRUSS REVIEW LETTER - LAYOUT (STAMPED)_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BLOCK 6 LOT 27 PLOT PLAN_V1.PDF DOCUMENTS VIEW