Permit: TC-MDP-0323-00751
Permit Details
Apply Date:
05/06/2023
Applicant:
Craig Morczynski
Description:
SFR LENNLE4001 T22-M0045
Permit Reviews
Permit Number - TC-MDP-0323-00751
Permit Status: Issued
Permit Description: SFR LENNLE4001 T22-M0045
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/08/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 05/12/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0323-00751
Permit Status: Issued
Permit Description: SFR LENNLE4001 T22-M0045
Total Outstanding Activity Conditions - 7
Date | Name |
---|---|
05/08/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
05/08/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
05/08/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
05/12/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. |
05/12/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
07/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
07/18/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0323-00751
Permit Status: Issued
Permit Description: SFR LENNLE4001 T22-M0045
Date | Description | Comments |
---|---|---|
03/16/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0323-00751
Permit Description: SFR LENNLE4001 T22-M0045
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/22/2023 | COT - RSPL - Yard Water Line | Passed | ||
06/22/2023 | COT - RSPL - Sewer | Passed | ||
06/22/2023 | COT - RSPL - Rough Soil | Passed | ||
07/10/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Ufer ground is in place and connected to the rebar reinforcement. Post tension cabling is laid out per plans and properly supported off the ground. Monolithic footing are properly dug. Okay to pour concrete slab and footings. | |
07/10/2023 | COT - RSBU - Preslab | Passed | Ufer ground is in place and connected to the rebar reinforcement. Post tension cabling is laid out per plans and properly supported off the ground. Monolithic footing are properly dug. Okay to pour concrete slab and footings. | |
07/10/2023 | COT - RSEL - Electrical Underground | Passed | Underground electrical for kitchen island is in place. Okay to pour concrete slab. | |
07/10/2023 | COT - RSEL - Grounding/Bonding | Passed | Ufer ground is in place and connected to the rebar reinforcement. Post tension cabling is laid out per plans and properly supported off the ground. Monolithic footing are properly dug. Okay to pour concrete slab and footings. | |
08/04/2023 | COT - RSBU - Roof Nailing | Passed | ||
08/10/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
09/20/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
09/20/2023 | BULD - Electrical Clearance | Passed | ||
09/20/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
09/27/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
01/22/2024 | COT - BULD - SWG Clearance | Passed | ||
02/08/2024 | COT - RSEL - Electrical Final | Passed | ||
02/08/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
02/08/2024 | COT - RSME - Mechanical Final | Passed | ||
02/08/2024 | COT - RSPL - Plumbing Final | Passed | ||
02/08/2024 | RSBU - Building Final | Passed | ||
02/22/2024 | ENGR Engineering Final | Passed | Please ensure that the clean out pipes in the front yard are repaired and cut down to grade so only the cap is showing. |