Permit: TC-MDP-0323-00735
Permit Details
Apply Date:
08/21/2023
Applicant:
Joshua Swinney
Description:
Harding SFR Model La Estancia TC-MDP-0123-00365
Permit Reviews
Permit Number - TC-MDP-0323-00735
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia TC-MDP-0123-00365
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/22/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 08/23/2023 | APPROVED |
08/08/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/09/2024 | APPROVED |
08/23/2023 | RESTAMP - RESIDENTIAL v.1 | 08/23/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0323-00735
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia TC-MDP-0123-00365
Date | Description | Comments |
---|---|---|
08/23/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
08/09/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
08/22/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/16/2023 | Post-Tension Inspection Report is required. | |
08/09/2024 | Post-Tension Inspection Report is required. | |
08/07/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/09/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/07/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
08/09/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
08/09/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
02/16/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
08/09/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0323-00735
Permite Description: Harding SFR Model La Estancia TC-MDP-0123-00365
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2023 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
10/27/2023 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0323-00735
Permit Description: Harding SFR Model La Estancia TC-MDP-0123-00365
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2023 | COT - RSPL - Rough Soil | Passed | ||
11/08/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
11/08/2023 | COT - RSEL - Electrical Underground | Passed | ||
11/13/2023 | COT - RSBU - Preslab | Passed | ||
11/13/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
12/18/2023 | COT - RSBU - Roof Nailing | Passed | Roof sheathing is properly installed and nailed off. Okay to proceed with roofing dry-in. | |
12/18/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | All H2.5 clips are properly installed on roof rafters. All hold downs are properly nailed to wall studs. All straps are properly nailed off. Plywood sheathing for exterior and interior shear walls are properly nailed per plan. Okay to proceed with exterior stucco prep. | |
02/06/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
02/16/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
03/04/2024 | COT - RSPL - Sewer | Passed | ||
03/22/2024 | BULD - Electrical Clearance | Passed | ||
08/07/2024 | COT - RSEL - Electrical Final | Passed | ||
08/07/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
08/07/2024 | COT - RSME - Mechanical Final | Passed | ||
08/07/2024 | COT - RSPL - Plumbing Final | Passed | ||
08/07/2024 | COT - RSPL - Yard Water Line | Passed | ||
08/07/2024 | ENGR Engineering Final | Passed | Move in ready | |
08/07/2024 | RSBU - Building Final | Passed | ||
08/07/2024 | RSBU - Building Progress | Passed |