Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/28/2023
Applicant:
Brianna Quiroz
Description:
Harding SFR Model La Estancia Address: 6524 E Paseo Baranda

Permit Reviews

Permit Number - TC-MDP-0323-00730
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia Address: 6524 E Paseo Baranda
Start Date Submittal Complete Date Status  
06/29/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 07/06/2023 REQUIRES RESUBMIT Review Details
07/19/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/20/2023 APPROVED Review Details
04/11/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/15/2024 APPROVED Review Details
03/19/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/22/2024 APPROVED Review Details
07/11/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.2 07/12/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0323-00730
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia Address: 6524 E Paseo Baranda
Total Outstanding Activity Conditions - 1
Date Name
08/07/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0323-00730
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia Address: 6524 E Paseo Baranda
Date Description Comments
04/05/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/05/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/05/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/16/2023 Post-Tension Inspection Report is required.
04/05/2024 Post-Tension Inspection Report is required.
04/05/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/07/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/05/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/05/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
02/16/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
03/22/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0323-00730
Permit Description: Harding SFR Model La Estancia Address: 6524 E Paseo Baranda
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/01/2023 COT - RSPL - Yard Water Line Passed 9/1/23: ok to back fill
09/01/2023 COT - RSPL - Rough Soil Passed 9/1/23: ok to back fill
09/12/2023 COT - RSEL - Electrical Underground Passed
09/12/2023 COT - RSBU - Preslab Passed
09/12/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
09/12/2023 COT - RSEL - Grounding/Bonding Passed
10/16/2023 COT - RSBU - Exterior Clips/Sheathing Passed
10/16/2023 COT - RSBU - Roof Nailing Passed
10/20/2023 COT - RSPL - Gas Pressure Test Passed
10/20/2023 COT - BULD - SWG Clearance Passed
11/21/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/21/2023 BULD - Electrical Clearance Passed
12/08/2023 COT - RSBU - Interior Shear Bracing Passed
02/07/2024 COT - RSPL - Sewer Passed
04/30/2024 ENGR Engineering Final Passed
05/01/2024 COT - RSEL - Electrical Final Passed
05/01/2024 COT - RSEL - Outdoor Lighting Passed
05/01/2024 COT - RSPL - Plumbing Final Passed
05/01/2024 COT - RSME - Mechanical Final Passed
05/01/2024 RSBU - Building Final Passed
05/01/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
Z350 HARDING- TRUSS DRAWINGS (STAMPED)_V1.PDF DOCUMENTS VIEW
Z350 HARDING- TRUSS REVIEW LETTER - LAYOUT (STAMPED)_V1.PDF DOCUMENTS VIEW
BLOCK 6 LOT 75 POST TENSION REPORT_V1.PDF DOCUMENTS VIEW
PARCEL 6 FINAL SIC - LOT 6075-2024-03-19_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BLOCK 6 LA ESTANCIA- PRIOR TO FINAL PLAT_V1.PDF DOCUMENTS VIEW
BLOCK 6 LOT 75 PLOT PLAN REVISED_V2.PDF DOCUMENTS VIEW
BLOCK 6 PLOT PLAN REVISION SUMMARY_V2.PDF DOCUMENTS VIEW