Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
02/23/2023
Applicant:
Description:
SFR DRHOH35F21 T21-M0043

Permit Reviews

Permit Number - TC-MDP-0323-00691
Permit Status: Complete
Permit Description: SFR DRHOH35F21 T21-M0043
Start Date Submittal Complete Date Status  
03/16/2023 RESIDENTIAL NEW DWELLING v.1 03/17/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0323-00691
Permit Status: Complete
Permit Description: SFR DRHOH35F21 T21-M0043
Total Outstanding Activity Conditions - 6
Date Name
03/16/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
03/16/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/16/2023 Post-Installed Anchor Inspection Report is required.
03/16/2023 Post-Tension Inspection Report is required.
03/16/2023 Special Inspection for Soil Tests
03/16/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0323-00691
Permite Description: SFR DRHOH35F21 T21-M0043
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
09/01/2023 COT - RSME - Mechanical Underground N/A Not Applicable
09/01/2023 RSEL - Electrical Progress N/A Canceled canceled by contractor

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0323-00691
Permit Description: SFR DRHOH35F21 T21-M0043
Total Completed Inspections - 23
Date Description Inspector Results Comments
08/16/2023 COT - RSEL - Grounding/Bonding Passed
08/16/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
08/16/2023 COT - RSBU - Preslab Passed
08/16/2023 COT - RSPL - Rough Soil Passed
08/16/2023 COT - RSEL - Electrical Underground Passed
09/01/2023 COT - RSBU - Exterior Clips/Sheathing Passed
09/01/2023 COT - RSBU - Roof Nailing Passed
09/01/2023 BULD - Electrical Clearance Passed TEP ECO
09/21/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/21/2023 RSEL - Electrical Progress Passed
09/21/2023 RSME - Mechanical Progress Passed
09/21/2023 COT - RSPL - Gas Pressure Test Passed
09/28/2023 COT - RSBU - Interior Shear Bracing Passed 9/1/23: not ready
9/28/23: passed
11/16/2023 COT - RSEL - Electrical Final Passed
11/16/2023 COT - RSME - Mechanical Final Passed
11/16/2023 COT - RSPL - Gas Final Passed
11/16/2023 RSBU - Building Final Passed
11/16/2023 RSBU - Building Progress Passed
11/16/2023 COT - RSPL - Plumbing Final Passed
11/16/2023 COT - RSEL - Outdoor Lighting Passed
11/16/2023 COT - BULD - SWG Clearance Passed SWG for meter only
11/16/2023 COT - RSPL - Sewer Passed
11/16/2023 COT - RSPL - Yard Water Line Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-SVB 42 D1_V1.PDF DOCUMENTS VIEW
SVB 42 NARRATIVE_V1.PDF DOCUMENTS VIEW
SVB 42 SIC-2023-03-14_V1.PDF DOCUMENTS VIEW