Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
02/23/2023
Applicant:
Description:
SFR DRHOH35G21 T21-M0042

Permit Reviews

Permit Number - TC-MDP-0323-00690
Permit Status: Issued
Permit Description: SFR DRHOH35G21 T21-M0042
Start Date Submittal Complete Date Status  
06/13/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/22/2023 APPROVED Review Details
03/16/2023 RESIDENTIAL NEW DWELLING v.1 03/21/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0323-00690
Permit Status: Issued
Permit Description: SFR DRHOH35G21 T21-M0042
Total Outstanding Activity Conditions - 1
Date Name
03/17/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0323-00690
Permit Status: Issued
Permit Description: SFR DRHOH35G21 T21-M0042
Date Description Comments
03/17/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
06/21/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/21/2023 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
06/21/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/17/2023 Soil Tests

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0323-00690
Permit Description: SFR DRHOH35G21 T21-M0042
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/26/2023 COT - RSPL - Rough Soil Passed Okay to backfill. Shading is required.
04/26/2023 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading is required.
04/26/2023 COT - RSPL - Sewer Passed Okay to backfill. Shading is required.
04/28/2023 COT - RSEL - Electrical Underground Passed
04/28/2023 COT - RSBU - Preslab Passed
04/28/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
05/30/2023 COT - RSBU - Exterior Clips/Sheathing Passed
05/30/2023 COT - RSBU - Roof Nailing Passed
06/09/2023 RSBU - Building Progress Passed
06/09/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Duplicate inspection 6/9/2023
06/09/2023 COT - RSPL - Gas Pressure Test Passed Duplicate inspection 6/9/2023
06/20/2023 COT - RSBU - Interior Shear Bracing Passed
08/09/2023 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 8/9/2023
08/11/2023 COT - RSME - Mechanical Final Passed
08/11/2023 COT - RSPL - Plumbing Final Passed
08/11/2023 COT - RSEL - Outdoor Lighting Passed
08/15/2023 BULD - Electrical Clearance Passed Duplicate inspection. 8/15/2023
08/15/2023 COT - RSEL - Electrical Final Passed Corrections were made. 8/15/2023
08/15/2023 COT - RSPL - Gas Final Passed
08/15/2023 RSBU - Building Final Passed Corrections were made. 8/15/2023
08/15/2023 COT - RSEL - Grounding/Bonding Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SVB 37 SIC-2023-06-09_V1.PDF DOCUMENTS VIEW
SVB 37 PT REPORT-2023-06-09_V1.PDF DOCUMENTS VIEW
CONS-SVB 37 D1_V1.PDF DOCUMENTS VIEW
SVB 37 NARRATIVE_V1.PDF DOCUMENTS VIEW
SVB 37 SIC-2023-03-14_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW