Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
02/23/2023
Applicant:
Description:
SFR DRHOH35G21 T21-M0042

Permit Reviews

Permit Number - TC-MDP-0323-00689
Permit Status: Complete
Permit Description: SFR DRHOH35G21 T21-M0042
Start Date Submittal Complete Date Status  
08/03/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/10/2023 APPROVED Review Details
03/16/2023 RESIDENTIAL NEW DWELLING v.1 03/21/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0323-00689
Permit Status: Complete
Permit Description: SFR DRHOH35G21 T21-M0042
Total Outstanding Activity Conditions - 1
Date Name
03/20/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0323-00689
Permit Status: Complete
Permit Description: SFR DRHOH35G21 T21-M0042
Date Description Comments
03/20/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/20/2023 Post-Installed Anchor Inspection Report is required.
03/20/2023 Soil Tests

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0323-00689
Permite Description: SFR DRHOH35G21 T21-M0042
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/23/2023 COT - RSME - Mechanical Underground N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0323-00689
Permit Description: SFR DRHOH35G21 T21-M0042
Total Completed Inspections - 20
Date Description Inspector Results Comments
05/05/2023 COT - RSPL - Rough Soil Passed
05/05/2023 COT - RSPL - Yard Water Line Passed
05/05/2023 COT - RSPL - Sewer Passed
05/12/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
05/12/2023 COT - RSBU - Preslab Passed
05/12/2023 COT - RSEL - Electrical Underground Passed
05/12/2023 COT - RSEL - Grounding/Bonding Passed
06/13/2023 COT - RSBU - Roof Nailing Passed Approved. 6/13/2023
06/13/2023 COT - RSBU - Exterior Clips/Sheathing Passed Approved. 6/13/2023
06/22/2023 COT - RSPL - Gas Pressure Test Passed
06/23/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/05/2023 COT - RSBU - Interior Shear Bracing Passed
07/20/2023 BULD - Electrical Clearance Passed Clearance for TEP ECO. 7/20/2023
08/18/2023 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 8/18/2023
08/23/2023 RSBU - Building Progress Passed
08/23/2023 COT - RSEL - Outdoor Lighting Passed
08/25/2023 COT - RSME - Mechanical Final Passed
08/25/2023 COT - RSPL - Gas Final Passed
08/28/2023 COT - RSEL - Electrical Final Passed Corrections were made. 8/28/2023
08/28/2023 RSBU - Building Final Passed Corrections were made. 8/28/2023

Documents

File Name Document Type  
SVB 41 PT REPORT-2023-08-02_V1.PDF DOCUMENTS VIEW
SVB 41 SIC-2023-08-02_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-SVB 41 D1_V1.PDF DOCUMENTS VIEW
SVB 41 NARRATIVE_V1.PDF DOCUMENTS VIEW
SVB 41 SIC-2023-03-14_V1.PDF DOCUMENTS VIEW