Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0323-00684
Permit Details
Apply Date:
03/23/2023
Applicant:
Daria Hopkins
Description:
SFR MERI156021 T21-M0063
Permit Reviews
Permit Number - TC-MDP-0323-00684
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/18/2024 | APPROVED |
03/24/2023 | RESIDENTIAL NEW DWELLING v.1 | 03/29/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0323-00684
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Date | Description | Comments |
---|---|---|
03/29/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
01/18/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
03/29/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
03/29/2023 | Post-Tension Inspection Report is required. | |
03/02/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
01/18/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
03/29/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0323-00684
Permite Description: SFR MERI156021 T21-M0063
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/05/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Canceled |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0323-00684
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/20/2023 | COT - RSPL - Sewer | Passed | ||
04/20/2023 | COT - RSPL - Yard Water Line | Passed | ||
05/01/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rough soil is complete, subsoil is compacted, footings are 12" deep, rebar reinforcement is installed at every location of the shear wall hold downs. Ufer ground is installed. Okay to pour concrete slab. | |
05/01/2023 | COT - RSBU - Preslab | Passed | Rough soil is complete, subsoil is compacted, footings are 12" deep, rebar reinforcement is installed at every location of the shear wall hold downs. Ufer ground is installed. Okay to pour concrete slab. | |
05/01/2023 | COT - RSPL - Rough Soil | Passed | Rough soil is complete, subsoil is compacted, footings are 12" deep, rebar reinforcement is installed at every location of the shear wall hold downs. Ufer ground is installed. Okay to pour concrete slab. | |
05/01/2023 | COT - RSEL - Grounding/Bonding | Passed | Ufer ground is in place. Okay to pour concrete. | |
05/09/2023 | COT - RSBU - Roof Nailing | Passed | ||
05/11/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
05/26/2023 | BULD - Electrical Clearance | Passed | ||
05/26/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
06/06/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
06/13/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
07/24/2023 | COT - BULD - SWG Clearance | Passed | Y/24/23: swg clearance for meter only. | |
08/07/2023 | COT - RSME - Mechanical Final | Passed | ||
08/07/2023 | COT - RSPL - Gas Final | Passed | ||
08/15/2023 | COT - RSPL - Plumbing Final | Passed | ||
08/16/2023 | COT - RSEL - Electrical Final | Passed | ||
08/16/2023 | RSBU - Building Final | Passed | ||
02/09/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
02/26/2024 | COT - RSME - Mechanical Underground | Passed | ||
02/26/2024 | RSBU - Building Progress | Passed | ||
02/26/2024 | COT - RSEL - Electrical Underground | Passed |