Permit: TC-MDP-0323-00668
Permit Details
Apply Date:
02/14/2023
Applicant:
Mark Alteri
Description:
SFR CVPLAN2.5 T22-M0062
Permit Reviews
Permit Number - TC-MDP-0323-00668
Permit Status: Complete
Permit Description: SFR CVPLAN2.5 T22-M0062
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/16/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/22/2023 | APPROVED |
03/17/2023 | RESIDENTIAL NEW DWELLING v.1 | 03/22/2023 | REQUIRES RESUBMIT |
03/27/2023 | RESIDENTIAL NEW DWELLING v.2 | 03/28/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0323-00668
Permit Status: Complete
Permit Description: SFR CVPLAN2.5 T22-M0062
Date | Description | Comments |
---|---|---|
03/20/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
03/20/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0323-00668
Permite Description: SFR CVPLAN2.5 T22-M0062
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/16/2023 | COT - RSBU - Exterior Clips/Sheathing | N/A | Re-inspection required | 5/16/2023: missing RSP clips around exterior, needs blocking for stairs at second landing |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0323-00668
Permit Description: SFR CVPLAN2.5 T22-M0062
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/14/2023 | COT - RSPL - Sewer | Passed | ||
04/14/2023 | COT - RSPL - Rough Soil | Passed | ||
04/19/2023 | COT - RSEL - Grounding/Bonding | Passed | Rebar reinforcement is in place for ufer ground on northeast corner of building. | |
04/19/2023 | COT - RSBU - Preslab | Passed | Post-tension cables are in place, with chairs holding it above subsoil. Subsoil is compacted. Rebar reinforcement is attached to shear wall braces. | |
04/19/2023 | COT - RSEL - Electrical Underground | Passed | Conduit for kitchen island is in place underground from outside wall to island location. | |
05/16/2023 | COT - RSBU - Roof Nailing | Passed | ||
05/18/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
06/09/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
06/22/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
07/28/2023 | COT - RSBU - Interior Shear Bracing | Passed | Interior shear walls on 2nd floor are properly screwed off. Okay to tape and texture walls. | |
09/28/2023 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 9/28/2023 | |
09/28/2023 | COT - RSEL - Electrical Final | Passed | ||
09/28/2023 | COT - RSME - Mechanical Final | Passed | ||
09/28/2023 | COT - RSME - Mechanical Underground | Passed | ||
09/28/2023 | COT - RSPL - Gas Final | Passed | ||
09/28/2023 | RSBU - Building Final | Passed | ||
09/28/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
09/28/2023 | ENGR Engineering Final | Passed | TCO okay for level 4, minor grading and landscape rock needed. | |
10/05/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
10/05/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
10/05/2023 | COT - RSPL - Yard Water Line | Passed |