Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
04/03/2023
Applicant:
Celina Rodriguez
Description:
SFR BT2013-140 T22-M0036

Permit Reviews

Permit Number - TC-MDP-0323-00660
Permit Status: Complete
Permit Description: SFR BT2013-140 T22-M0036
Start Date Submittal Complete Date Status  
04/07/2023 RESIDENTIAL NEW DWELLING v.1 04/12/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0323-00660
Permit Status: Complete
Permit Description: SFR BT2013-140 T22-M0036
Total Outstanding Activity Conditions - 2
Date Name
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0323-00660
Permit Status: Complete
Permit Description: SFR BT2013-140 T22-M0036
Date Description Comments
04/11/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
04/07/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/07/2023 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
04/07/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/07/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/11/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0323-00660
Permite Description: SFR BT2013-140 T22-M0036
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
06/30/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 6-30-23: Provide gauge for water pipe test.
05/31/2023 COT - RSBU - Exterior Clips/Sheathing N/A Partial Pass 5-31-23: Anchors are wedge type not Titen. Builder will obtain sealed letter from EOR and reschedule with intermediate.
06/30/2023 COT - RSPL - Backwater Valve N/A Re-inspection required 6-30-23: Expose valve for inspection.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0323-00660
Permit Description: SFR BT2013-140 T22-M0036
Total Completed Inspections - 22
Date Description Inspector Results Comments
05/09/2023 COT - RSPL - Yard Water Line Passed
05/09/2023 COT - RSPL - Sewer Passed
05/09/2023 COT - RSPL - Rough Soil Passed
05/16/2023 COT - RSEL - Electrical Underground Passed
05/16/2023 COT - RSBU - Preslab Passed
05/16/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
05/30/2023 COT - RSBU - Roof Nailing Passed
06/30/2023 COT - RSPL - Gas Pressure Test Passed
06/30/2023 COT - RSEL - Grounding/Bonding Passed
07/05/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/05/2023 COT - RSBU - Exterior Clips/Sheathing Passed
07/25/2023 BULD - Electrical Clearance Passed TEP ECO
07/28/2023 COT - RSBU - Interior Shear Bracing Passed
10/02/2023 COT - BULD - SWG Clearance Passed Approved, SWG Clearance is required for the new meter set
10/10/2023 COT - RSEL - Electrical Final Passed
10/10/2023 COT - RSME - Mechanical Final Passed
10/10/2023 COT - RSME - Mechanical Underground Passed
10/10/2023 COT - RSPL - Gas Final Passed
10/10/2023 COT - RSEL - Outdoor Lighting Passed
10/11/2023 RSBU - Building Final Passed
10/11/2023 RSBU - Building Progress Passed
10/11/2023 COT - RSPL - Plumbing Final Passed

Documents

File Name Document Type  
BELLA TIERRA - LOT 30 START_V1.PDF DOCUMENTS VIEW
BELLA TIERRA 30 SIC-2023-04-03_V1.PDF DOCUMENTS VIEW