Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
03/16/2023
Applicant:
Mark Alteri
Description:
SFR CVPLAN3 T22-M0044

Permit Reviews

Permit Number - TC-MDP-0323-00642
Permit Status: Complete
Permit Description: SFR CVPLAN3 T22-M0044
Start Date Submittal Complete Date Status  
04/10/2023 RESIDENTIAL NEW DWELLING v.3 04/14/2023 APPROVED Review Details
06/16/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/22/2023 APPROVED Review Details
03/29/2023 RESIDENTIAL NEW DWELLING v.2 04/03/2023 REQUIRES RESUBMIT Review Details
03/20/2023 RESIDENTIAL NEW DWELLING v.1 03/23/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-0323-00642
Permit Status: Complete
Permit Description: SFR CVPLAN3 T22-M0044
Date Description Comments
03/22/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
03/22/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/22/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0323-00642
Permit Description: SFR CVPLAN3 T22-M0044
Total Completed Inspections - 20
Date Description Inspector Results Comments
04/27/2023 COT - RSPL - Rough Soil Passed
04/27/2023 COT - RSPL - Sewer Passed
04/27/2023 COT - RSPL - Yard Water Line Passed
05/03/2023 COT - RSBU - Preslab Passed Rebar reinforcement is in place for shear wall hold downs. Post-tension cable is in place. Okay to pour concrete slab.
05/03/2023 COT - RSEL - Electrical Underground Passed Kitchen island conduit is in place.
05/03/2023 COT - RSBU - Excavation/Rebar/Zoning Passed Rebar reinforcement is in place for shear wall hold downs. Post-tension cable is in place.
05/03/2023 COT - RSEL - Grounding/Bonding Passed Ufer ground is in place.
05/25/2023 COT - RSBU - Roof Nailing Passed
06/14/2023 BULD - Electrical Clearance Passed TEP ECO
06/14/2023 COT - RSBU - Exterior Clips/Sheathing Passed
07/31/2023 COT - RSPL - Gas Pressure Test Passed
08/03/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/25/2023 COT - RSBU - Interior Shear Bracing Passed
10/27/2023 COT - BULD - SWG Clearance Passed Duplicate inspection. 10/27/2023
10/27/2023 COT - RSPL - Backwater Valve Passed Duplicate inspection. 10/27/2023
10/27/2023 RSBU - Building Final Passed
10/27/2023 COT - RSEL - Electrical Final Passed Duplicate inspection. 10/27/2023
10/27/2023 COT - RSEL - Outdoor Lighting Passed Duplicate inspection. 10/27/2023
10/27/2023 COT - RSME - Mechanical Final Passed Duplicate inspection. 10/27/2023
10/27/2023 COT - RSPL - Plumbing Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PT REPORT LOT 1-2023-06-15_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CBT LOT 1 PP 3_V3.PDF DOCUMENTS VIEW
PT CERT-2023-03-16_V1.PDF DOCUMENTS VIEW