Permit: TC-MDP-0323-00642
Permit Details
Apply Date:
03/16/2023
Applicant:
Mark Alteri
Description:
SFR CVPLAN3 T22-M0044
Permit Reviews
Permit Number - TC-MDP-0323-00642
Permit Status: Complete
Permit Description: SFR CVPLAN3 T22-M0044
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/10/2023 | RESIDENTIAL NEW DWELLING v.3 | 04/14/2023 | APPROVED |
06/16/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/22/2023 | APPROVED |
03/29/2023 | RESIDENTIAL NEW DWELLING v.2 | 04/03/2023 | REQUIRES RESUBMIT |
03/20/2023 | RESIDENTIAL NEW DWELLING v.1 | 03/23/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0323-00642
Permit Status: Complete
Permit Description: SFR CVPLAN3 T22-M0044
Date | Description | Comments |
---|---|---|
03/22/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
03/22/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
03/22/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0323-00642
Permit Description: SFR CVPLAN3 T22-M0044
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/27/2023 | COT - RSPL - Rough Soil | Passed | ||
04/27/2023 | COT - RSPL - Sewer | Passed | ||
04/27/2023 | COT - RSPL - Yard Water Line | Passed | ||
05/03/2023 | COT - RSBU - Preslab | Passed | Rebar reinforcement is in place for shear wall hold downs. Post-tension cable is in place. Okay to pour concrete slab. | |
05/03/2023 | COT - RSEL - Electrical Underground | Passed | Kitchen island conduit is in place. | |
05/03/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar reinforcement is in place for shear wall hold downs. Post-tension cable is in place. | |
05/03/2023 | COT - RSEL - Grounding/Bonding | Passed | Ufer ground is in place. | |
05/25/2023 | COT - RSBU - Roof Nailing | Passed | ||
06/14/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
06/14/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
07/31/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
08/03/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
08/25/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
10/27/2023 | COT - BULD - SWG Clearance | Passed | Duplicate inspection. 10/27/2023 | |
10/27/2023 | COT - RSPL - Backwater Valve | Passed | Duplicate inspection. 10/27/2023 | |
10/27/2023 | RSBU - Building Final | Passed | ||
10/27/2023 | COT - RSEL - Electrical Final | Passed | Duplicate inspection. 10/27/2023 | |
10/27/2023 | COT - RSEL - Outdoor Lighting | Passed | Duplicate inspection. 10/27/2023 | |
10/27/2023 | COT - RSME - Mechanical Final | Passed | Duplicate inspection. 10/27/2023 | |
10/27/2023 | COT - RSPL - Plumbing Final | Passed |