Permit: TC-MDP-0323-00637
Permit Details
Apply Date:
05/23/2023
Applicant:
Mark Alteri
Description:
SFR CVPLAN2.5 T22-M0062
Permit Reviews
Permit Number - TC-MDP-0323-00637
Permit Status: Complete
Permit Description: SFR CVPLAN2.5 T22-M0062
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/16/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/17/2023 | APPROVED |
05/24/2023 | RESIDENTIAL NEW DWELLING v.1 | 06/13/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0323-00637
Permit Status: Complete
Permit Description: SFR CVPLAN2.5 T22-M0062
Date | Description | Comments |
---|---|---|
05/24/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
10/17/2023 | Post-Tension Inspection Report is required. | |
05/24/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/10/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0323-00637
Permit Description: SFR CVPLAN2.5 T22-M0062
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/21/2023 | COT - RSPL - Backwater Valve | Passed | ||
06/21/2023 | COT - RSPL - Rough Soil | Passed | ||
06/21/2023 | COT - RSPL - Sewer | Passed | ||
06/21/2023 | COT - RSPL - Yard Water Line | Passed | ||
06/27/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/27/2023 | COT - RSBU - Preslab | Passed | ||
06/27/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
07/27/2023 | COT - RSBU - Roof Nailing | Passed | ||
07/31/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
09/20/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
10/20/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
11/16/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
01/17/2024 | COT - RSEL - Electrical Final | Passed | Construction is complete. Mechanical, electrical, plumbing fixtures are installed and operational. GFCI Outlets are installed where required, AFCI Breakers are installed in panel boxes for bedrooms. Outdoor lighting is per plans. Okay to issue Certificate of Occupancy once all other inspections are completed and approved. | |
01/17/2024 | COT - RSEL - Electrical Underground | Passed | 1/17/24: Underground electrical for kitchen island okay. | |
01/17/2024 | COT - RSEL - Outdoor Lighting | Passed | Construction is complete. Mechanical, electrical, plumbing fixtures are installed and operational. GFCI Outlets are installed where required, AFCI Breakers are installed in panel boxes for bedrooms. Outdoor lighting is per plans. Okay to issue Certificate of Occupancy once all other inspections are completed and approved. | |
01/17/2024 | COT - RSME - Mechanical Final | Passed | Construction is complete. Mechanical, electrical, plumbing fixtures are installed and operational. GFCI Outlets are installed where required, AFCI Breakers are installed in panel boxes for bedrooms. Outdoor lighting is per plans. Okay to issue Certificate of Occupancy once all other inspections are completed and approved. | |
01/17/2024 | COT - RSPL - Plumbing Final | Passed | Construction is complete. Mechanical, electrical, plumbing fixtures are installed and operational. GFCI Outlets are installed where required, AFCI Breakers are installed in panel boxes for bedrooms. Outdoor lighting is per plans. Okay to issue Certificate of Occupancy once all other inspections are completed and approved. | |
01/17/2024 | RSBU - Building Final | Passed | Construction is complete. Mechanical, electrical, plumbing fixtures are installed and operational. GFCI Outlets are installed where required, AFCI Breakers are installed in panel boxes for bedrooms. Outdoor lighting is per plans. Okay to issue Certificate of Occupancy once all other inspections are completed and approved. | |
01/17/2024 | RSBU - Building Progress | Passed | ||
01/19/2024 | ENGR Engineering Final | Passed | ||
01/24/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Duplicate: Passed 10/20/23 by Tom Lundberg. |