Permit: TC-MDP-0226-00095
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
6223 E CAMPOLINA TR
Address NEW:
6223 E CAMPOLINA TR
Apply Date:
02/26/2026
Applicant:
Helen Ormsby
Description:
Blackhawk H30K Model Plan (2024 IRC) (Model Master Plan TC-MDP-0126-00013)
Permit Reviews
Permit Number - TC-MDP-0226-00095
Permit Status: Inspections complete
Permit Description: Blackhawk H30K Model Plan (2024 IRC) (Model Master Plan TC-MDP-0126-00013)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/17/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/17/2026 | APPROVED |
| 06/01/2026 | SPECIAL INSPECTION REVIEW v.1 | 06/01/2026 | APPROVED |
| 03/03/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 03/13/2026 | APPROVED |
Conditions
Permit Number - TC-MDP-0226-00095
Permit Status: Inspections complete
Permit Description: Blackhawk H30K Model Plan (2024 IRC) (Model Master Plan TC-MDP-0126-00013)
| Date | Description | Comments |
|---|---|---|
| 02/26/2026 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. | |
| 02/26/2026 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 03/03/2026 | Post-Installed Anchor Inspection Report is required. | |
| 02/26/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 03/03/2026 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 02/26/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0226-00095
Permite Description: Blackhawk H30K Model Plan (2024 IRC) (Model Master Plan TC-MDP-0126-00013)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2026 | ENGR Engineering Final | N/A | Not Ready | Outstanding condition-leakage and duct tightness is not satisfied prior to final. Submit to portal and allow time for processing. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0226-00095
Permit Description: Blackhawk H30K Model Plan (2024 IRC) (Model Master Plan TC-MDP-0126-00013)
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/31/2026 | COT - RSPL - Rough Soil | Passed | 3.31.26 Approved |
|
| 03/31/2026 | COT - RSPL - Sewer | Passed | ||
| 03/31/2026 | COT - RSPL - Yard Water Line | Passed | ||
| 04/06/2026 | BULD - Electrical Clearance | Passed | 04/06/2026 Approved clearance TEP ECO. |
|
| 04/06/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 04/06/2026 Approved per plan, okay for concrete placement. |
|
| 04/06/2026 | COT - RSBU - Preslab | Passed | 04/06/2026 Approved per plan, okay for concrete placement. |
|
| 04/06/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 04/24/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 04/24/2026 Corrections made to prior inspection. |
|
| 04/24/2026 | COT - RSBU - Roof Nailing | Passed | 04/24/2026 Corrections made to prior inspection. |
|
| 05/06/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 5.6.26 Approved |
|
| 05/06/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 05/26/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 06/18/2026 | COT - BULD - SWG Clearance | Passed | ||
| 07/15/2026 | RSBU - Building Progress | Passed | ||
| 07/15/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 07/15/2026 | COT - RSME - Mechanical Final | Passed | ||
| 07/15/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/17/2026 | ENGR Engineering Final | Passed | ||
| 07/17/2026 | RSBU - Building Final | Passed | ||
| 07/17/2026 | COT - RSEL - Electrical Final | Passed | 7-17-26 All items listed have been corrected |