Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
12/19/2022
Applicant:
Celina Rodriguez
Description:
SFR BT1465-130 T22-M0011 (Model master plan TC-MDP-0123-00350)

Permit Reviews

Permit Number - TC-MDP-0225-00149
Permit Status: Inspections complete
Permit Description: SFR BT1465-130 T22-M0011 (Model master plan TC-MDP-0123-00350)
Start Date Submittal Complete Date Status  
02/27/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 03/17/2025 REQUIRES RESUBMIT Review Details
03/18/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.2 03/31/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0225-00149
Permit Status: Inspections complete
Permit Description: SFR BT1465-130 T22-M0011 (Model master plan TC-MDP-0123-00350)
Total Outstanding Activity Conditions - 4
Date Name
02/25/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
03/05/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/05/2025 Post-Installed Anchor Inspection Report is required.
03/05/2025 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0225-00149
Permit Status: Inspections complete
Permit Description: SFR BT1465-130 T22-M0011 (Model master plan TC-MDP-0123-00350)
Date Description Comments
02/27/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
02/25/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00149
Permit Description: SFR BT1465-130 T22-M0011 (Model master plan TC-MDP-0123-00350)
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/04/2025 COT - RSPL - Yard Water Line Passed Passed 4/4/25 ok to backfill
04/04/2025 COT - RSPL - Rough Soil Passed Passed 4/4/25 ok to backfill
04/04/2025 COT - RSPL - Sewer Passed Passed 4/4/25 ok to backfill
04/11/2025 COT - RSBU - Preslab Passed Passed 4/11/25 ok to pour concrete
04/11/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 4/11/25 ok to pour concrete
04/11/2025 COT - RSEL - Electrical Underground Passed Passed 4/11/25 ok to pour concrete
04/24/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 4/24/25 corrections made
04/24/2025 COT - RSBU - Roof Nailing Passed 4/24/25 corrections made
05/06/2025 BULD - Electrical Clearance Passed Ready for temp power CLEARANCE ECO
05/08/2025 COT - RSEL - Grounding/Bonding Passed Passed 5/8/25
05/08/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 5/8/25
05/08/2025 COT - RSPL - Gas Pressure Test Passed Passed 5/8/25
05/22/2025 COT - RSBU - Interior Shear Bracing Passed Passed 5/22/25 ok to tape
06/27/2025 COT - BULD - SWG Clearance Passed 6/27/25
SOUTHWEST GAS CLEARANCE: SWG
07/03/2025 COT - RSEL - Electrical Final Passed Passed 7/3/25
07/03/2025 COT - RSEL - Outdoor Lighting Passed Passed 7/3/25
07/03/2025 COT - RSME - Mechanical Final Passed Passed 7/3/25
07/03/2025 COT - RSPL - Plumbing Final Passed Passed 7/3/25
07/03/2025 RSBU - Building Final Passed Passed 7/3/25
07/03/2025 RSBU - Building Progress Passed Passed 7/3/25
07/08/2025 ENGR Engineering Final Passed Site is complete according to approved plans. CofO ready.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BTIII 60 SIC-2025-02-25_V1.PDF DOCUMENTS VIEW