Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
05/13/2025
Applicant:
Description:
SFR RKF55I T21-M0086 (Model master plan TC-MDP-0123-00345)

Permit Reviews

Permit Number - TC-MDP-0225-00143
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086 (Model master plan TC-MDP-0123-00345)
Start Date Submittal Complete Date Status  
05/15/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/29/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0225-00143
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086 (Model master plan TC-MDP-0123-00345)
Total Outstanding Activity Conditions - 4
Date Name
02/14/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
05/16/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/16/2025 Post-Installed Anchor Inspection Report is required.
05/16/2025 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0225-00143
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086 (Model master plan TC-MDP-0123-00345)
Date Description Comments
02/14/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
02/14/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00143
Permite Description: SFR RKF55I T21-M0086 (Model master plan TC-MDP-0123-00345)
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
10/06/2025 BULD - Electrical Clearance N/A Canceled canceled per Carlos
10/06/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Canceled
12/23/2025 COT - RSEL - Electrical Final N/A Re-inspection required Cut wire free hanging in kitchen, clean outs not to grade, missing clean out cover in driveway, box missing cover in hallway near restroom, insulate hot water line at garage, drain not fitted in shower.
12/23/2025 COT - RSME - Mechanical Final N/A Re-inspection required Cut wire free hanging in kitchen, clean outs not to grade, missing clean out cover in driveway, box missing cover in hallway near restroom, insulate hot water line at garage, drain not fitted in shower.
12/23/2025 COT - RSPL - Plumbing Final N/A Re-inspection required Cut wire free hanging in kitchen, clean outs not to grade, missing clean out cover in driveway, box missing cover in hallway near restroom, insulate hot water line at garage, drain not fitted in shower.
12/19/2025 RSBU - Building Final N/A Re-inspection required Clean outs in back yard not cut to grade, missing post tension tag, glass still being installed through. STOPPED INSPECTION MORE ITEMS MAY BE ADDED

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00143
Permit Description: SFR RKF55I T21-M0086 (Model master plan TC-MDP-0123-00345)
Total Completed Inspections - 22
Date Description Inspector Results Comments
08/19/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 8.19.25
Plumbed per plans
Green tracer verified
Blue tracer verified
Trench pre shaded
Approved
08/19/2025 COT - RSPL - Backwater Valve Passed 8.19.25
Plumbed per plans
Green tracer verified
Blue tracer verified
Trench pre shaded
Approved
08/19/2025 COT - RSPL - Rough Soil Passed 8.19.25
Plumbed per plans
Green tracer verified
Blue tracer verified
Trench pre shaded
Approved
08/19/2025 COT - RSPL - Sewer Passed 8.19.25
Plumbed per plans
Green tracer verified
Blue tracer verified
Trench pre shaded
Approved
08/25/2025 COT - RSBU - Preslab Passed
08/25/2025 COT - RSEL - Electrical Underground Passed
08/25/2025 COT - RSPL - Yard Water Line Passed
09/16/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 9.16.25
approved
09/16/2025 COT - RSBU - Roof Nailing Passed
10/06/2025 COT - RSPL - Gas Pressure Test Passed
10/10/2025 BULD - Electrical Clearance Passed
10/10/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/29/2025 COT - RSBU - Interior Shear Bracing Passed
12/12/2025 COT - RSEL - Grounding/Bonding Passed 12/12/2025
Approved, tied in to MSP behind mud ring.
12/12/2025 COT - BULD - SWG Clearance Passed 12/12/2025
Clearance to Southwest Gas.
12/19/2025 ENGR Engineering Final Passed Cast iron cap in driveway needs to be placed. Site is complete.
12/19/2025 RSBU - Building Progress Passed
12/23/2025 COT - RSEL - Outdoor Lighting Passed Passed 12/23/25
01/08/2026 COT - RSEL - Electrical Final Passed 01/08/2026
All corrections made to prior inspection, no other items found.
01/08/2026 COT - RSME - Mechanical Final Passed 01/08/2026
All corrections made to prior inspection, no other items found.
01/08/2026 COT - RSPL - Plumbing Final Passed 01/08/2026
All corrections made to prior inspection, no other items found.
01/08/2026 RSBU - Building Final Passed 01/08/2026
All corrections made to prior inspection, no other items found.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2025-05-13_V1.PDF DOCUMENTS VIEW