Permit: TC-MDP-0225-00135
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12725 E WILLIAM CAMP CT
Address NEW:
12725 E WILLIAM CAMP CT
Apply Date:
02/13/2025
Applicant:
Description:
SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Permit Reviews
Permit Number - TC-MDP-0225-00135
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/25/2025 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/03/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0225-00135
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 02/14/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 04/02/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 04/02/2025 | Post-Installed Anchor Inspection Report is required. |
| 04/02/2025 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0225-00135
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
| Date | Description | Comments |
|---|---|---|
| 03/25/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 02/14/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 04/02/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 04/02/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00135
Permite Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/16/2025 | BULD - Electrical Clearance | N/A | Re-inspection required | 6-16-25: missing breakers and labelling. |
| 06/16/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 6-16-25: fix leak at DWV master bathroom tub and tape tears on flex above kitchen island, block registers in bedroom 2 & 3. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00135
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2025 | COT - RSPL - Sewer | Passed | 4/28/25: Plumbing underground per plan ok to proceed with backfill. Shading required | |
| 04/28/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 04/28/2025 | COT - RSPL - Rough Soil | Passed | 4/28/25: Plumbing underground per plan ok to proceed with backfill. Shading required | |
| 05/02/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 5/2/25 ok to pour concrete | |
| 05/02/2025 | COT - RSBU - Preslab | Passed | Passed 5/2/25 ok to pour concrete | |
| 05/19/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Passed 5/19/25 | |
| 05/19/2025 | COT - RSBU - Roof Nailing | Passed | Passed 5/19/25 | |
| 06/16/2025 | COT - RSEL - Grounding/Bonding | Passed | 6-16-25: grounding/bonding approved. | |
| 06/16/2025 | COT - RSEL - Electrical Underground | Passed | 6-16-25: approved. | |
| 06/16/2025 | COT - RSPL - Gas Pressure Test | Passed | 6-16-25: gas pressure test approved. | |
| 06/18/2025 | BULD - Electrical Clearance | Passed | 6/18/2025 clearance for TEP ECO. | |
| 06/26/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 6/26/25 passed corrections made | |
| 07/02/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 08/21/2025 | COT - BULD - SWG Clearance | Passed | 8.21.2025 Clearance for SW Gas. |
|
| 09/08/2025 | COT - RSEL - Electrical Final | Passed | 9.8.25 Approved |
|
| 09/08/2025 | COT - RSEL - Outdoor Lighting | Passed | 9.8.25 Approved |
|
| 09/08/2025 | COT - RSME - Mechanical Final | Passed | 9.8.25 Approved |
|
| 09/08/2025 | COT - RSPL - Plumbing Final | Passed | 9.8.25 Approved |
|
| 09/08/2025 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 09/08/2025 | RSBU - Building Final | Passed | 9.8.25 Approved |
|
| 09/08/2025 | RSBU - Building Progress | Passed | 9.8.25 Approved |