Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
02/13/2025
Applicant:
Brandon Kempel
Description:
SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)

Permit Reviews

Permit Number - TC-MDP-0225-00134
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Start Date Submittal Complete Date Status  
04/28/2025 RESTAMP - RESIDENTIAL v.1 04/28/2025 APPROVED Review Details
04/15/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/22/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0225-00134
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Total Outstanding Activity Conditions - 4
Date Name
02/14/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
04/28/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/28/2025 Post-Installed Anchor Inspection Report is required.
04/28/2025 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0225-00134
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Date Description Comments
02/14/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
02/14/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00134
Permite Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
06/09/2025 COT - RSBU - Roof Nailing N/A Re-inspection required 6-9-25: add nails to exterior sheathing and at interior shear walls at marked locations, add shot pins to marked location and nail those marked in red flush to sill plate, add H-25's 3-pt bearing girder truss at garage/ bedroom 2, beam to post connections require 10 nails above/below interconnecting points-see Detail S5.1-6., loose roof panel at master suite bathroom.
06/09/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 6-9-25: add nails to exterior sheathing and at interior shear walls at marked locations, add shot pins to marked location and nail those marked in red flush to sill plate, add H-25's 3-pt bearing girder truss at garage/ bedroom 2, beam to post connections require 10 nails above/below interconnecting points-see Detail S5.1-6., loose roof panel at master suite bathroom.
05/19/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass Partial pass for ufer, will check connection at later date

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00134
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/13/2025 COT - RSPL - Backwater Valve Passed
05/13/2025 COT - RSPL - Rough Soil Passed
05/13/2025 COT - RSPL - Sewer Passed
05/13/2025 COT - RSPL - Yard Water Line Passed
05/19/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 5/19/25 ok to pour concrete
05/19/2025 COT - RSBU - Preslab Passed Passed 5/19/25 ok to pour concrete
05/19/2025 COT - RSEL - Electrical Underground Passed Passed 5/19/25 ok to pour concrete
06/10/2025 COT - RSBU - Roof Nailing Passed 6-10-25: roof nailing approved.
07/15/2025 COT - RSPL - Gas Pressure Test Passed Passed 7/15/25
07/16/2025 BULD - Electrical Clearance Passed Passed 7/16/25 CLEARANCE ECO
07/16/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 7/16/25 corrections made
07/28/2025 COT - RSBU - Interior Shear Bracing Passed 7.28.25
Fastener schedule;e verified per plan at all interior shear walls. Proceed.
07/28/2025 COT - RSEL - Grounding/Bonding Passed 7.28.25
09/08/2025 COT - BULD - SWG Clearance Passed 9.8.25
Approved
09/23/2025 COT - RSEL - Electrical Final Passed
09/23/2025 COT - RSEL - Outdoor Lighting Passed
09/23/2025 COT - RSME - Mechanical Final Passed
09/23/2025 COT - RSPL - Plumbing Final Passed
09/23/2025 ENGR Engineering Final Passed
09/23/2025 RSBU - Building Final Passed
09/23/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
1_SPECIAL INSPECTION CERT-2025-04-04_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW