Permit: TC-MDP-0225-00125
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
2720 S BRANDYWINE LN
Address NEW:
2720 S BRANDYWINE LN
Apply Date:
02/13/2025
Applicant:
Chris Irby
Description:
1453T Ireland - We have purchased this plan/property from Cornerstone Homes and would like to permit from previously approved plan. (Model master plan TC-MDP-0125-00009)
Permit Reviews
Permit Number - TC-MDP-0225-00125
Permit Status: Complete
Permit Description: 1453T Ireland - We have purchased this plan/property from Cornerstone Homes and would like to permit from previously approved plan. (Model master plan TC-MDP-0125-00009)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/18/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.3 | 04/25/2025 | APPROVED |
| 03/21/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 03/21/2025 | REQUIRES RESUBMIT |
| 12/08/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/10/2025 | APPROVED |
| 12/12/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/15/2025 | APPROVED |
| 09/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/24/2025 | REQUIRES RESUBMIT |
| 11/13/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 11/17/2025 | APPROVED |
| 03/25/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 04/03/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0225-00125
Permit Status: Complete
Permit Description: 1453T Ireland - We have purchased this plan/property from Cornerstone Homes and would like to permit from previously approved plan. (Model master plan TC-MDP-0125-00009)
| Date | Description | Comments |
|---|---|---|
| 04/01/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 04/18/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 04/01/2025 | Post-Installed Anchor Inspection Report is required. | |
| 04/01/2025 | Post-Tension Inspection Report is required. | |
| 02/14/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 02/14/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 04/01/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 11/24/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0225-00125
Permite Description: 1453T Ireland - We have purchased this plan/property from Cornerstone Homes and would like to permit from previously approved plan. (Model master plan TC-MDP-0125-00009)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/04/2025 | COT - RSME - Mechanical Final | N/A | Re-inspection required | Needs self shutting hinges for garage door |
| 08/04/2025 | RSBU - Building Final | N/A | Re-inspection required | Needs self shutting hinges for garage door and dish washer installed |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0225-00125
Permit Description: 1453T Ireland - We have purchased this plan/property from Cornerstone Homes and would like to permit from previously approved plan. (Model master plan TC-MDP-0125-00009)
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/07/2025 | COT - RSPL - Backwater Valve | Passed | Passed 5/7/25 ok to backfill | |
| 05/07/2025 | COT - RSPL - Rough Soil | Passed | Passed 5/7/25 ok to backfill | |
| 05/07/2025 | COT - RSPL - Sewer | Passed | Passed 5/7/25 ok to backfill | |
| 05/07/2025 | COT - RSPL - Yard Water Line | Passed | Passed 5/7/25 ok to backfill | |
| 05/13/2025 | BULD - Electrical Clearance | Passed | Ready for temp power CLEARANCE ECO | |
| 05/13/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 5/13/25 ok to pour concrete | |
| 05/13/2025 | COT - RSBU - Preslab | Passed | Passed 5/13/25 ok to pour concrete | |
| 05/13/2025 | COT - RSEL - Electrical Underground | Passed | Passed 5/13/25 ok to pour concrete | |
| 05/23/2025 | COT - RSBU - Roof Nailing | Passed | Add anchor bolts at marked locations shear wall and sw wall, nail rsp clip at sw wall corner, tighten anchor bolts at garage, replace damaged stud upstairs near landing, provide engineering fix for 2 snapped trusses upstairs master bedroom | |
| 06/03/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 6/3/25 Pass |
|
| 06/13/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 6/13/25 | |
| 06/13/2025 | COT - RSEL - Grounding/Bonding | Passed | Passed 6/13/25 | |
| 06/13/2025 | COT - RSPL - Gas Pressure Test | Passed | Passed 6/13/25 | |
| 06/30/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed 6/30/25 | |
| 08/01/2025 | COT - BULD - SWG Clearance | Passed | 8/01/25 SOUTHWEST GAS CLEARANCE: SWG |
|
| 08/04/2025 | COT - RSEL - Electrical Final | Passed | Passed 8/4/25 | |
| 08/04/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed 8/4/25 | |
| 08/04/2025 | COT - RSPL - Plumbing Final | Passed | Passed 8/4/25 | |
| 08/04/2025 | RSBU - Building Progress | Passed | Passed 8/4/25 | |
| 08/07/2025 | COT - RSME - Mechanical Final | Passed | Passed 8/7/25 | |
| 08/07/2025 | RSBU - Building Final | Passed | Passed 8/7/25 | |
| 08/07/2025 | ENGR Engineering Final | Passed | Site is safe and accessible. Everything completed in accordance with approved plans. |