Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address:
5948 E JAYDEN LN
Address NEW:
5948 E JAYDEN LN
Apply Date:
02/05/2025
Applicant:
Candis Benson
Description:
New Residential Model Plan (Model master plan TC-MDP-1224-01414)

Permit Reviews

Permit Number - TC-MDP-0225-00121
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01414)
Start Date Submittal Complete Date Status  
02/12/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 02/21/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0225-00121
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01414)
Total Outstanding Activity Conditions - 5
Date Name
02/07/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
02/14/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
02/14/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/14/2025 Post-Tension Inspection Report is required.
02/14/2025

Conditions

Permit Number - TC-MDP-0225-00121
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01414)
Date Description Comments
02/07/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
02/07/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00121
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01414)
Total Completed Inspections - 22
Date Description Inspector Results Comments
03/18/2025 COT - RSEL - Grounding/Bonding Passed Ground rods present and at proper distance and depth 3/18/25
03/18/2025 BULD - Electrical Clearance Passed Ground rods present and at proper distance and depth 3/18/25 temp breaker and receptacle installed, address tag present CLEARANCE ECO
03/18/2025 COT - RSPL - Backwater Valve Passed Passed 3/18/25 ok to backfill
03/18/2025 COT - RSPL - Rough Soil Passed Passed 3/18/25 ok to backfill
03/18/2025 COT - RSPL - Sewer Passed Passed 3/18/25 ok to backfill
03/18/2025 COT - RSPL - Yard Water Line Passed Passed 3/18/25 ok to backfill
03/25/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 3/25/25 ok to pour concrete
03/25/2025 COT - RSBU - Preslab Passed Passed 3/25/25 ok to pour concrete
03/25/2025 COT - RSEL - Electrical Underground Passed Passed 3/25/25 ok to pour concrete
04/10/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Approved. 4/10/2025
04/10/2025 COT - RSBU - Roof Nailing Passed Approved. 4/10/2025
04/28/2025 COT - RSPL - Gas Pressure Test Passed
04/29/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 4/28/25: Cleanouts missing in wall first floor, ground all metallic boxes, seal all penetrations through top plate in garage, secure UFER and Install mud-ring, DVW not under test, seal chase at master and upstairs, secure nm cable upstairs, seal all penetrations through decking, secure DVW horizontal runs 4' o.c
4/29/25: corrections made ok to proceed.
05/13/2025 COT - RSBU - Interior Shear Bracing Passed
06/17/2025 COT - BULD - SWG Clearance Passed 6/17/25: SWG CLEARANCE
06/30/2025 COT - RSEL - Electrical Final Passed
06/30/2025 COT - RSEL - Outdoor Lighting Passed
06/30/2025 COT - RSME - Mechanical Final Passed
06/30/2025 COT - RSPL - Plumbing Final Passed
06/30/2025 ENGR Engineering Final Passed CO Ready
06/30/2025 RSBU - Building Final Passed
06/30/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2025-02-10_V1.PDF DOCUMENTS VIEW