Permit Reviews

Permit Number - TC-MDP-0225-00119
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01414)
Start Date Submittal Complete Date Status  
05/01/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 05/12/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0225-00119
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01414)
Total Outstanding Activity Conditions - 5
Date Name
02/07/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
05/05/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/05/2025 Post-Installed Anchor Inspection Report is required.
05/05/2025 Post-Tension Inspection Report is required.
05/05/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-0225-00119
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01414)
Date Description Comments
02/07/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
02/07/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00119
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01414)
Total Completed Inspections - 22
Date Description Inspector Results Comments
05/27/2025 COT - RSPL - Backwater Valve Passed 5-27-25, backwater valve and underground plumbing verified under test and per plans. Okay to backfill with shading materials.
05/27/2025 COT - RSPL - Rough Soil Passed 5-27-25, backwater valve and underground plumbing verified under test and per plans. Okay to backfill with shading materials.
05/27/2025 COT - RSPL - Sewer Passed 5-27-25, sewer connection approved. Okay to backfill with shading materials.
05/27/2025 COT - RSPL - Yard Water Line Passed 5-27-25, main water line approved. Okay to backfill with shading materials.
06/02/2025 BULD - Electrical Clearance Passed 6-2-25: panel okay to be energized. ECO clearance issued to TEP.
06/03/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 6-3-25: excavation/reinforcement/setbacks and preslab verified per plans. Okay to pour concrete.
06/03/2025 COT - RSBU - Preslab Passed 6-3-25: excavation/reinforcement/setbacks and preslab verified per plans. Okay to pour concrete.
06/03/2025 COT - RSEL - Electrical Underground Passed 6-3-25: electrical underground,excavation/reinforcement/setbacks and preslab verified per plans. Okay to pour concrete.
06/17/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
06/17/2025 COT - RSBU - Roof Nailing Passed
07/01/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/01/2025 COT - RSEL - Grounding/Bonding Passed
07/01/2025 COT - RSPL - Gas Pressure Test Passed
07/15/2025 COT - RSBU - Interior Shear Bracing Passed Passed 5/15/25 ok to tape and mud
08/18/2025 COT - BULD - SWG Clearance Passed 8.18.25
Approved
08/27/2025 COT - RSEL - Electrical Final Passed
08/27/2025 COT - RSEL - Outdoor Lighting Passed
08/27/2025 COT - RSME - Mechanical Final Passed
08/27/2025 COT - RSPL - Plumbing Final Passed
08/27/2025 RSBU - Building Final Passed
08/27/2025 RSBU - Building Progress Passed
08/28/2025 ENGR Engineering Final Passed CO Ready

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2025-04-27_V1.PDF DOCUMENTS VIEW