Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address:
5942 E JAYDEN LN
Address NEW:
5942 E JAYDEN LN
Apply Date:
02/05/2025
Applicant:
mark wolfel
Description:
New Residential Model Plan (Model master plan TC-MDP-1224-01415)

Permit Reviews

Permit Number - TC-MDP-0225-00116
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01415)
Start Date Submittal Complete Date Status  
02/12/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 02/21/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0225-00116
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01415)
Total Outstanding Activity Conditions - 5
Date Name
02/07/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
02/14/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
02/14/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/14/2025 Post-Installed Anchor Inspection Report is required.
02/14/2025 Soil Compaction Special Inspection is Required.

Conditions

Permit Number - TC-MDP-0225-00116
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01415)
Date Description Comments
02/07/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
02/07/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00116
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01415)
Total Completed Inspections - 22
Date Description Inspector Results Comments
03/25/2025 COT - RSPL - Backwater Valve Passed Passed 3/25/25 ok to backfill
03/25/2025 COT - RSPL - Rough Soil Passed Passed 3/25/25 ok to backfill
03/25/2025 COT - RSPL - Sewer Passed Passed 3/25/25 ok to backfill
03/25/2025 COT - RSPL - Yard Water Line Passed Passed 3/25/25 ok to backfill
03/25/2025 BULD - Electrical Clearance Passed Passed 3/25/25 ready for temp power CLEARANCE ECO
04/01/2025 COT - RSEL - Electrical Underground Passed
04/02/2025 COT - RSBU - Preslab Passed 2 April 25
Pass
04/02/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 2 April 25
Pass
04/21/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 4-21-25, exterior clips/sheathing approved. Okay to continue with construction.
04/21/2025 COT - RSBU - Roof Nailing Passed 4-21-25, roof nailing approved. Okay to dry-in roof.
05/05/2025 COT - RSPL - Gas Pressure Test Passed
05/06/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 5/6/2025 approved. Corrections were made.
05/06/2025 COT - RSEL - Grounding/Bonding Passed 5/6/2025 approved. Corrections were made.
05/16/2025 COT - RSBU - Interior Shear Bracing Passed
06/24/2025 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 6/24/2025
07/02/2025 COT - RSEL - Electrical Final Passed
07/02/2025 COT - RSEL - Outdoor Lighting Passed
07/02/2025 COT - RSME - Mechanical Final Passed
07/02/2025 COT - RSPL - Plumbing Final Passed
07/02/2025 ENGR Engineering Final Passed
07/02/2025 RSBU - Building Final Passed
07/02/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2025-02-10_V1.PDF DOCUMENTS VIEW