Permit: TC-MDP-0225-00114
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
5906 E JAYDEN LN
Address NEW:
5906 E JAYDEN LN
Apply Date:
06/30/2025
Applicant:
Candis Benson
Description:
New Residential Model Plan (Model master plan TC-MDP-1224-01415)
Permit Reviews
Permit Number - TC-MDP-0225-00114
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01415)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/02/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 07/08/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0225-00114
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01415)
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 02/07/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 07/02/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 07/02/2025 | Post-Installed Anchor Inspection Report is required. |
| 07/02/2025 | Post-Tension Inspection Report is required. |
| 07/02/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0225-00114
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01415)
| Date | Description | Comments |
|---|---|---|
| 02/07/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 02/07/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00114
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01415)
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/24/2025 | COT - RSPL - Backwater Valve | Passed | 7.24.25 Rough plumbing system is installed according to plan and per code. Proper fittings and pipe sizes verified throughout. 10ft head of water verified for pipes under test. Tracer wires present. Backwater valve in place. Trench conditions acceptable. Ok to backfill. |
|
| 07/24/2025 | COT - RSPL - Rough Soil | Passed | ||
| 07/24/2025 | COT - RSPL - Sewer | Passed | 7.24.25 Rough plumbing system is installed according to plan and per code. Proper fittings and pipe sizes verified throughout. 10ft head of water verified for pipes under test. Tracer wires present. Backwater valve in place. Trench conditions acceptable. Ok to backfill. |
|
| 07/24/2025 | COT - RSPL - Yard Water Line | Passed | 7.24.25 Rough plumbing system is installed according to plan and per code. Proper fittings and pipe sizes verified throughout. 10ft head of water verified for pipes under test. Tracer wires present. Backwater valve in place. Trench conditions acceptable. Ok to backfill. |
|
| 07/28/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 7.28.25 Footer depth verified. Rebar size, placement and clearance verified. Uffer verified. Hold downs verified per plan. Ok to pour |
|
| 07/28/2025 | COT - RSBU - Preslab | Passed | 7.28.25 Footer depth verified. Rebar size, placement and clearance verified. Uffer verified. Hold downs verified per plan. Ok to pour |
|
| 07/28/2025 | COT - RSEL - Electrical Underground | Passed | 7.28.25 Verified per plan and per code |
|
| 08/11/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 8.11.25 Rsp4s verified H25 verified A35 verified Anchor bolts verified Shot pins verified Straps verified Fastener schedule verified at sheathing Roof nailing verified Truss schedule verified Bracing verified Approved |
|
| 08/11/2025 | COT - RSBU - Roof Nailing | Passed | approved | |
| 08/25/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 08/25/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 08/25/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 09/03/2025 | COT - RSBU - Interior Shear Bracing | Passed | 9.3.2025 Nail schedule per plan. |
|
| 09/08/2025 | BULD - Electrical Clearance | Passed | 9/8/25:Ok to set meters . Code: ECO | |
| 10/15/2025 | COT - BULD - SWG Clearance | Passed | ||
| 10/24/2025 | COT - RSEL - Electrical Final | Passed | ||
| 10/24/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 10/24/2025 | COT - RSME - Mechanical Final | Passed | ||
| 10/24/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 10/24/2025 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. Engineering is okay for CofO. | |
| 10/24/2025 | RSBU - Building Final | Passed | ||
| 10/24/2025 | RSBU - Building Progress | Passed |