Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address:
5936 E JAYDEN LN
Address NEW:
5936 E JAYDEN LN
Apply Date:
02/05/2025
Applicant:
Candis Benson
Description:
New Residential Model Plan (Model master plan TC-MDP-1224-01413)

Permit Reviews

Permit Number - TC-MDP-0225-00110
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01413)
Start Date Submittal Complete Date Status  
03/21/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 04/01/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0225-00110
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01413)
Total Outstanding Activity Conditions - 5
Date Name
02/07/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
03/25/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/25/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/25/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/25/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-0225-00110
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01413)
Date Description Comments
02/07/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
02/07/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
03/25/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
03/25/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00110
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01413)
Total Completed Inspections - 23
Date Description Inspector Results Comments
04/15/2025 COT - RSPL - Backwater Valve Passed Passed 4/15/25 ok to backfill
04/15/2025 COT - RSPL - Rough Soil Passed Passed 4/15/25 ok to backfill
04/15/2025 COT - RSPL - Sewer Passed Passed 4/15/25 ok to backfill
04/15/2025 COT - RSPL - Yard Water Line Passed Passed 4/15/25 ok to backfill
04/15/2025 BULD - Electrical Clearance Passed Passed 4/15/25 CLEARANCE ECO
04/21/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 4-21-25, excavation/rebar/zoning verified per plans. Okay to pour concrete.
04/21/2025 COT - RSBU - Preslab Passed 4-21-25, preslab, underground electric,excavation/rebar/zoning verified per plans. Okay to pour concrete.
04/21/2025 COT - RSEL - Electrical Underground Passed 4-21-25, electrical underground approved. Okay to pour concrete.
04/30/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/30/2025 COT - RSBU - Roof Nailing Passed
05/14/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/14/2025 COT - RSPL - Gas Pressure Test Passed
05/14/2025 COT - RSEL - Grounding/Bonding Passed
05/22/2025 COT - RSBU - Interior Shear Bracing Passed 5-22-25, shear bracing inspection approved. Okay to tape & texture drywall
06/27/2025 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 6/27/2025
07/10/2025 COT - RSEL - Electrical Final Passed 7-10-25: plumbing, electrical, outdoor lighting, mechanical, and building finals approved.
07/10/2025 COT - RSEL - Outdoor Lighting Passed 7-10-25: plumbing, electrical, outdoor lighting, mechanical, and building finals approved.
07/10/2025 COT - RSPL - Plumbing Final Passed 7-10-25: plumbing, electrical, outdoor lighting, mechanical, and building finals approved.
07/10/2025 COT - RSME - Mechanical Final Passed 7-10-25: plumbing, electrical, outdoor lighting, mechanical, and building finals approved.
07/10/2025 ENGR Engineering Final Passed Site is safe and in accordance with approved plans.
07/10/2025 RSBU - Building Final Passed 7-10-25: plumbing, electrical, outdoor lighting, mechanical, and building finals approved.
07/10/2025 RSBU - Building Progress Passed
07/10/2025 RSEL - Electrical Progress Passed