Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Address NEW:
9633 E WYNALDA DR
Apply Date:
08/29/2025
Applicant:
Celina Rodriguez
Description:
Mirador Point 1909 Plan (Model master plan TC-MDP-0125-00034)

Permit Reviews

Permit Number - TC-MDP-0225-00101
Permit Status: Inspections
Permit Description: Mirador Point 1909 Plan (Model master plan TC-MDP-0125-00034)
Start Date Submittal Complete Date Status  
09/04/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/12/2025 REQUIRES RESUBMIT Review Details
09/23/2025 RESTAMP - RESIDENTIAL v.1 09/23/2025 APPROVED Review Details
09/16/2025 SITE FROM MODEL PERMIT - PRODUCTION v.2 09/23/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0225-00101
Permit Status: Inspections
Permit Description: Mirador Point 1909 Plan (Model master plan TC-MDP-0125-00034)
Total Outstanding Activity Conditions - 4
Date Name
02/07/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/04/2025 Post-Installed Anchor Inspection Report is required.
09/04/2025 Post-Tension Inspection Report is required.
09/04/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-0225-00101
Permit Status: Inspections
Permit Description: Mirador Point 1909 Plan (Model master plan TC-MDP-0125-00034)
Date Description Comments
02/07/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
02/07/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0225-00101
Permite Description: Mirador Point 1909 Plan (Model master plan TC-MDP-0125-00034)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
10/02/2025 COT - RSBU - Excavation/Rebar/Zoning N/A Re-inspection required 10/2/25:Post-tension cables must be spaced per approved plans, footing missing at north section at wall per approved plans, width and depth of footing not per approved plans, please remove all debris from footing at UFER location.
10/02/2025 COT - RSBU - Preslab N/A Re-inspection required 10/2/25:Post-tension cables must be spaced per approved plans, footing missing at north section at wall per approved plans, width and depth of footing not per approved plans, please remove all debris from footing at UFER location.
10/30/2025 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0225-00101
Permit Description: Mirador Point 1909 Plan (Model master plan TC-MDP-0125-00034)
Total Completed Inspections - 12
Date Description Inspector Results Comments
09/26/2025 COT - RSPL - Yard Water Line Passed
09/26/2025 COT - RSPL - Sewer Passed
09/26/2025 COT - RSPL - Rough Soil Passed
10/02/2025 COT - RSEL - Electrical Underground Passed
10/02/2025 COT - RSEL - Grounding/Bonding Passed
10/03/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
10/03/2025 COT - RSBU - Preslab Passed
10/17/2025 COT - RSBU - Roof Nailing Passed
10/21/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 10.21.2025
Corrections made to 10.17.2025 inspection, truss calcs provided and per plan.
10/30/2025 BULD - Electrical Clearance Passed 10.30.2025
Clearance TEP ECO.
10/31/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10.31.2025
Corrections made to yesterday's inspection.
11/10/2025 COT - RSBU - Interior Shear Bracing Passed 11-10-25: interior shear bracing approved-okay to tape & texture.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
MIRADOR POINT - LOT 193 START_V2.PDF DOCUMENTS VIEW
MP 193 SIC-2025-08-29_V1.PDF DOCUMENTS VIEW