Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address:
9528 E MEOLA DR
Address NEW:
9528 E MEOLA DR
Apply Date:
02/04/2025
Applicant:
Celina Rodriguez
Description:
Mirador Point 1842 Plan (Model master plan TC-MDP-0125-00032)

Permit Reviews

Permit Number - TC-MDP-0225-00095
Permit Status: Inspections complete
Permit Description: Mirador Point 1842 Plan (Model master plan TC-MDP-0125-00032)
Start Date Submittal Complete Date Status  
02/27/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/11/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0225-00095
Permit Status: Inspections complete
Permit Description: Mirador Point 1842 Plan (Model master plan TC-MDP-0125-00032)
Total Outstanding Activity Conditions - 6
Date Name
02/07/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
03/05/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/05/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/05/2025 Post-Installed Anchor Inspection Report is required.
03/05/2025 Post-Tension Inspection Report is required.
03/05/2025 Soil Compaction Special Inspection is Required.

Conditions

Permit Number - TC-MDP-0225-00095
Permit Status: Inspections complete
Permit Description: Mirador Point 1842 Plan (Model master plan TC-MDP-0125-00032)
Date Description Comments
02/07/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
02/07/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00095
Permite Description: Mirador Point 1842 Plan (Model master plan TC-MDP-0125-00032)
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
04/23/2025 COT - BULD - SWG Clearance N/A Not Applicable Site does not use gas
04/23/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable Site does not use gas
04/23/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required Caulk and fire foam marked areas
05/02/2025 COT - RSBU - Interior Shear Bracing N/A Re-inspection required 4 April 25
Call this in for drywall.
5/2/25: Fasteners at shearwalls shall be no closer than 3/8" from edge.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00095
Permit Description: Mirador Point 1842 Plan (Model master plan TC-MDP-0125-00032)
Total Completed Inspections - 19
Date Description Inspector Results Comments
03/14/2025 COT - RSPL - Rough Soil Passed 14 March 25
Ok to backfill, shading required.
03/14/2025 COT - RSPL - Sewer Passed 14 March 25
Ok to backfill, shading required.
03/14/2025 COT - RSPL - Yard Water Line Passed 14 March 25
Ok to backfill, shading required.
03/24/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 3/24/25 ok to pour concrete
03/24/2025 COT - RSBU - Preslab Passed Passed 3/24/25 ok to pour concrete
03/24/2025 COT - RSEL - Electrical Underground Passed Passed 3/24/25 ok to pour concrete
04/04/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/04/2025 COT - RSBU - Roof Nailing Passed
04/08/2025 BULD - Electrical Clearance Passed Approved new 200A service panel - TEC Clearance is required for construction power
04/23/2025 COT - RSEL - Grounding/Bonding Passed Passed 4/23/25
04/24/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 4/24/25 corrections made
05/02/2025 COT - RSBU - Interior Shear Bracing Passed 4 April 25
Call this in for drywall.
5/2/25: Fasteners at shearwalls shall be no closer than 3/8" from edge.
5/2/25: corrections made
08/20/2025 COT - RSEL - Electrical Final Passed 8.20.25
APPROVED
08/20/2025 COT - RSEL - Outdoor Lighting Passed 8.20.25
APPROVED
08/20/2025 ENGR Engineering Final Passed
08/20/2025 RSBU - Building Progress Passed
08/21/2025 COT - RSME - Mechanical Final Passed 8.21.25
APPROVED
08/21/2025 COT - RSPL - Plumbing Final Passed 8.21.25
APPROVED
08/21/2025 RSBU - Building Final Passed 8.21.25
APPROVED

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
MIRADOR POINT - LOT 127 START_V1.PDF DOCUMENTS VIEW
MP 127 SIC-2025-02-25_V1.PDF DOCUMENTS VIEW