Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
01/29/2025
Applicant:
Dana Petty
Description:
Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)

Permit Reviews

Permit Number - TC-MDP-0225-00081
Permit Status: Complete
Permit Description: Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)
Start Date Submittal Complete Date Status  
09/12/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/15/2025 APPROVED Review Details
03/14/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 03/28/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0225-00081
Permit Status: Complete
Permit Description: Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)
Date Description Comments
02/03/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/12/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/12/2025 Post-Tension Inspection Report is required.
02/03/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
02/03/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0225-00081
Permite Description: Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
09/25/2025 RSBU - Building Final N/A Re-inspection required 1. All ceiling pre wires need to be capped with wire nuts.
2. Refrigerant service ports missing anti-tamper caps.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0225-00081
Permit Description: Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/11/2025 COT - RSPL - Rough Soil Passed 7-11-25: sewer connection and underground plumbing verified per plans.Okay to backfill with shading materials.
07/11/2025 COT - RSPL - Sewer Passed 7-11-25: sewer connection and underground plumbing verified per plans.Okay to backfill with shading materials.
07/11/2025 COT - RSPL - Yard Water Line Passed 7-11-25: main water line approved. Okay to backfill.
07/18/2025 COT - RSEL - Electrical Underground Passed Passed 7/18/25 ok to pour concrete
07/18/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 7/18/25 ok to pour concrete
07/24/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 7.24.25
Trimmers, studs, anchor bolts, RBCs, shot pins, masas, a35s, rsp4s, truss schedule, headers, straps, mailings all verified per notes in plans and per code.
07/24/2025 COT - RSBU - Roof Nailing Passed 7.24.25
08/04/2025 BULD - Electrical Clearance Passed 8.4.25
08/04/2025 COT - RSBU - Preslab Passed passed before
08/04/2025 COT - RSEL - Grounding/Bonding Passed 8.4.25
passed connection verified
08/04/2025 COT - RSPL - Gas Pressure Test Passed
08/05/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 8.5.25
Satisfactory corrections made - approved
08/12/2025 COT - RSBU - Interior Shear Bracing Passed 8-12-25: interior shear bracing approved. Okay for tape & texture.
09/15/2025 COT - BULD - SWG Clearance Passed 9.15.25
Approved for gas clearance
09/25/2025 COT - RSEL - Electrical Final Passed
09/25/2025 COT - RSEL - Outdoor Lighting Passed
09/25/2025 COT - RSME - Mechanical Final Passed
09/25/2025 COT - RSPL - Plumbing Final Passed
09/25/2025 ENGR Engineering Final Passed Site is clean and complete in accordance with approved plans.
09/25/2025 RSBU - Building Progress Passed
09/29/2025 RSBU - Building Final Passed 9.29.25
Corrections made
Approved

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
155987 PT LOT 103 COMPLETE-2025-09-10_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 103 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 103 SPECIAL INSPECTION CERTIFICATE-2025-03-13_V1.PDF DOCUMENTS VIEW