Permit: TC-MDP-0225-00076
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
3625 E NEBRASKA SV
Address NEW:
3625 E NEBRASKA SV
Apply Date:
01/28/2025
Applicant:
Description:
Roca Realty model L 1-12 (Model master plan TC-MDP-0723-01248)
Permit Reviews
Permit Number - TC-MDP-0225-00076
Permit Status: Complete
Permit Description: Roca Realty model L 1-12 (Model master plan TC-MDP-0723-01248)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/14/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 03/10/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0225-00076
Permit Status: Complete
Permit Description: Roca Realty model L 1-12 (Model master plan TC-MDP-0723-01248)
| Date | Description | Comments |
|---|---|---|
| 02/03/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 02/03/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 02/03/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0225-00076
Permite Description: Roca Realty model L 1-12 (Model master plan TC-MDP-0723-01248)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/22/2025 | COT - RSEL - Grounding/Bonding | N/A | Partial Pass | 12/22/2025 UFER only. |
| 05/28/2026 | COT - RSEL - Electrical Underground | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0225-00076
Permit Description: Roca Realty model L 1-12 (Model master plan TC-MDP-0723-01248)
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/18/2025 | COT - RSPL - Rough Soil | Passed | 12/18/2025 Approved and all fixtures holding under test - ok to backfill with shading materials. |
|
| 12/22/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12/22/2025 Approved per plan and setbacks verified. Okay for concrete placement. |
|
| 12/22/2025 | COT - RSBU - Preslab | Passed | 12/22/2025 Approved per plan and setbacks verified. Okay for concrete placement. |
|
| 01/21/2026 | COT - RSPL - Sewer | Passed | 01/21/2026 Approved. Holding under test to HCS with green tracer wire. Okay to backfill with shading materials. |
|
| 02/20/2026 | BULD - Electrical Clearance | Passed | 2.20.26 approved |
|
| 02/20/2026 | COT - RSBU - Roof Nailing | Passed | 2.20.26 approved |
|
| 02/20/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 2.20.26 Approved |
|
| 03/17/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 03/17/2026 Approved. Added blocking to can light to protect PEX water line above on bathroom. |
|
| 03/17/2026 | COT - RSEL - Grounding/Bonding | Passed | 03/17/2026 Tied in to main service panel. |
|
| 04/07/2026 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 4/7/2026 | |
| 05/28/2026 | COT - RSBU - Interior Shear Bracing | Passed | 5/28/2026 Verified nail schedule. |
|
| 05/28/2026 | COT - RSEL - Electrical Final | Passed | ||
| 05/28/2026 | COT - RSEL - Outdoor Lighting | Passed | 5/28/2026 Verified added light at rear patio. |
|
| 05/28/2026 | COT - RSME - Mechanical Final | Passed | ||
| 05/28/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 05/28/2026 | ENGR Engineering Final | Passed | ||
| 05/28/2026 | RSBU - Building Final | Passed |