Permit: TC-MDP-0225-00075
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
3619 E NEBRASKA SV
Address NEW:
3619 E NEBRASKA SV
Apply Date:
01/28/2025
Applicant:
Description:
Roca Realty model L 1-12 (Model master plan TC-MDP-0723-01248)
Permit Reviews
Permit Number - TC-MDP-0225-00075
Permit Status: Complete
Permit Description: Roca Realty model L 1-12 (Model master plan TC-MDP-0723-01248)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/14/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 03/10/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0225-00075
Permit Status: Complete
Permit Description: Roca Realty model L 1-12 (Model master plan TC-MDP-0723-01248)
| Date | Description | Comments |
|---|---|---|
| 02/03/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 02/03/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 02/03/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0225-00075
Permite Description: Roca Realty model L 1-12 (Model master plan TC-MDP-0723-01248)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/15/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Partial Pass | 10.15.25 Partial pending DWV being put under test. OK to proceed at progress areas do NOT cover or obstruct DWV |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0225-00075
Permit Description: Roca Realty model L 1-12 (Model master plan TC-MDP-0723-01248)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2025 | COT - RSPL - Rough Soil | Passed | 7-21-25: underground plumbing verified per plans. Okay to backfill with shading materials. | |
| 08/01/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Approved. Okay for concrete placement. 8/1/2025 | |
| 08/01/2025 | COT - RSBU - Preslab | Passed | Approved. Okay for concrete placement. 8/1/2025 | |
| 08/08/2025 | COT - RSPL - Sewer | Passed | ||
| 09/12/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/12/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 9.12.2025 Added H2.5 to truss in closet as well as anchors bolts in marked locations. |
|
| 09/12/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 10/17/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 12/22/2025 | BULD - Electrical Clearance | Passed | 12/22/2025 Clearance to TEP ECO. Verified added correct metal address tag. |
|
| 12/22/2025 | COT - RSPL - Yard Water Line | Passed | 12/22/2025 Approved and holding under test to meter with blue tracer - okay to backfill with shading materials. |
|
| 01/28/2026 | RSBU - Building Final | Passed | ||
| 01/27/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 01/28/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 01/28/2026 | COT - RSME - Mechanical Final | Passed | ||
| 01/28/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 01/28/2026 | COT - RSEL - Electrical Final | Passed | ||
| 01/28/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 01/28/2026 | COT - RSEL - Electrical Underground | Passed |