1453T Ireland We have purchased this plan/property from Cornerstone Homes and would like to permit from previously approved plan. (Model master plan TC-MDP-0125-00009)
Permit Reviews
Permit Number - TC-MDP-0225-00068
Permit Status: Complete
Permit Description: 1453T Ireland We have purchased this plan/property from Cornerstone Homes and would like to permit from previously approved plan. (Model master plan TC-MDP-0125-00009)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 07/14/2025 | REQUIRES RESUBMIT |
| 12/03/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/03/2025 | APPROVED |
| 11/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 11/28/2025 | APPROVED |
| 05/16/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/16/2025 | REQUIRES RESUBMIT |
| 12/05/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/05/2025 | APPROVED |
| 02/06/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 02/14/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0225-00068
Permit Status: Complete
Permit Description: 1453T Ireland We have purchased this plan/property from Cornerstone Homes and would like to permit from previously approved plan. (Model master plan TC-MDP-0125-00009)
| Date | Description | Comments |
|---|---|---|
| 02/06/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 02/06/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 02/06/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 02/06/2025 | Post-Tension Inspection Report is required. | |
| 02/03/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 02/03/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 02/06/2025 | Soil Compaction Special Inspection is Required. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0225-00068
Permite Description: 1453T Ireland We have purchased this plan/property from Cornerstone Homes and would like to permit from previously approved plan. (Model master plan TC-MDP-0125-00009)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2025 | COT - RSPL - Rough Soil | N/A | Re-inspection required | 3 April 25 1. Plumbing not per plan, DWV is on the wrong side of the house and too close to water line. DWV needs to be relocated to south side of house. |
| 04/03/2025 | COT - RSPL - Sewer | N/A | Re-inspection required | 3 April 25 1. Plumbing not per plan, DWV is on the wrong side of the house and too close to water line. DWV needs to be relocated to south side of house. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0225-00068
Permit Description: 1453T Ireland We have purchased this plan/property from Cornerstone Homes and would like to permit from previously approved plan. (Model master plan TC-MDP-0125-00009)
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2025 | COT - RSPL - Backwater Valve | Passed | ||
| 04/03/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 04/03/2025 | BULD - Electrical Clearance | Passed | 3 April 25 TEP CLEARANCE: ECO |
|
| 04/04/2025 | COT - RSPL - Rough Soil | Passed | 4/4/25 corrections made | |
| 04/04/2025 | COT - RSPL - Sewer | Passed | 4/4/25 corrections made | |
| 04/08/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 4/8/25 ok to pour concrete | |
| 04/08/2025 | COT - RSBU - Preslab | Passed | Passed 4/8/25 ok to pour concrete | |
| 04/08/2025 | COT - RSEL - Electrical Underground | Passed | Passed 4/8/25 ok to pour concrete | |
| 04/14/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 4/14/25 passed, ok to proceed to intermediate stage | |
| 04/14/2025 | COT - RSBU - Roof Nailing | Passed | 4/14/25 passed, ok to proceed to intermediate stage | |
| 04/21/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 4/21/24 | |
| 04/21/2025 | COT - RSEL - Grounding/Bonding | Passed | Passed 4/21/24 | |
| 04/21/2025 | COT - RSPL - Gas Pressure Test | Passed | Passed 4/21/24 | |
| 04/30/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed 4/30/25 | |
| 05/19/2025 | COT - BULD - SWG Clearance | Passed | Passed 5/19/25 CLEARANCE SWG | |
| 05/21/2025 | COT - RSEL - Electrical Final | Passed | Passed final 5/21/25 | |
| 05/21/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 5/21/25 | |
| 05/21/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 5/21/25 | |
| 05/21/2025 | COT - RSME - Mechanical Final | Passed | Passed final 5/21/25 | |
| 05/21/2025 | RSBU - Building Final | Passed | Passed final 5/21/25 | |
| 05/21/2025 | RSBU - Building Progress | Passed | Passed final 5/21/25 | |
| 05/27/2025 | ENGR Engineering Final | Passed | Sidewalk and wall are complete. Site is clean and clear in accordance with plans. |