SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Permit Reviews
Permit Number - TC-MDP-0224-00261
Permit Status: Inspections complete
Permit Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 03/15/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0224-00261
Permit Status: Inspections complete
Permit Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 02/27/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 02/27/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 03/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 03/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 03/15/2024 | Post-Installed Anchor Inspection Report is required. |
| 03/15/2024 | Post-Tension Inspection Report is required. |
| 03/15/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0224-00261
Permit Status: Inspections complete
Permit Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
| Date | Description | Comments |
|---|---|---|
| 02/27/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 03/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0224-00261
Permite Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2024 | COT - BULD - SWG Clearance | N/A | Not Ready | Not ready, missing water heater and shut off valves 9/23/24 |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0224-00261
Permit Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2024 | COT - RSPL - Rough Soil | Passed | ||
| 05/15/2024 | COT - RSPL - Sewer | Passed | ||
| 05/15/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 05/24/2024 | COT - RSBU - Preslab | Passed | ||
| 05/24/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 05/24/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 07/08/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 07/08/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 08/07/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 8/7/24: mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and drywall installation. | |
| 08/07/2024 | COT - RSEL - Grounding/Bonding | Passed | Ufer ground is installed in concrete footing. | |
| 08/07/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is pressurized to 15psi with no leaks. Okay to proceed. | |
| 08/23/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall is properly installed and screwed to studs per the plan requirements for an interior shear braced walls. | |
| 09/23/2024 | BULD - Electrical Clearance | Passed | Passed DGC CLEARANCE 9/23/24 | |
| 10/03/2024 | COT - BULD - SWG Clearance | Passed | 10-3-24, verified equipment in place. Clearance issued to Southwest Gas. | |
| 10/16/2024 | COT - FCON - Sprinkler - Final | Passed | ||
| 10/16/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 10/16/2024 | ENGR Engineering Final | Passed | CO Ready | |
| 10/16/2024 | RSBU - Building Progress | Passed | ||
| 10/18/2024 | COT - RSEL - Electrical Final | Passed | 10/18/24: Bathroom doors are installed, ceiling light in stairwell is installed, and exhaust fans in bathrooms are installed and operational. Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
| 10/18/2024 | COT - RSME - Mechanical Final | Passed | 10/18/24: Bathroom doors are installed, ceiling light in stairwell is installed, and exhaust fans in bathrooms are installed and operational. Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
| 10/18/2024 | COT - RSPL - Plumbing Final | Passed | 10/18/24: Bathroom doors are installed, ceiling light in stairwell is installed, and exhaust fans in bathrooms are installed and operational. Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
| 10/18/2024 | RSBU - Building Final | Passed | 10/18/24: Bathroom doors are installed, ceiling light in stairwell is installed, and exhaust fans in bathrooms are installed and operational. Construction is complete per plans. Okay to issue Certificate of Occupancy. |