Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
4799 E JULIAN WASH DR
Apply Date:
03/29/2024
Applicant:
Dana Petty
Description:
SFR MERI132021 T21-M0062

Permit Reviews

Permit Number - TC-MDP-0224-00252
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Start Date Submittal Complete Date Status  
10/09/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/09/2024 APPROVED Review Details
12/19/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/19/2024 APPROVED Review Details
04/01/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 04/05/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0224-00252
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Date Description Comments
04/03/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/03/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/03/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/03/2024 Post-Tension Inspection Report is required.
02/23/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/23/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/03/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
04/03/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0224-00252
Permit Description: SFR MERI132021 T21-M0062
Total Completed Inspections - 21
Date Description Inspector Results Comments
10/24/2024 COT - RSPL - Rough Soil Passed 10-24-24, underground plumbing per approved plans. Okay to backfill.
10/24/2024 COT - RSPL - Sewer Passed 10-24-24, Sewer connection per approved plans. Okay to backfill.
10/24/2024 COT - RSPL - Yard Water Line Passed 10-24-24, Main water line per approved plans. Okay to backfill.
11/01/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 11-1-24, setbacks verified per approved plans.
11/01/2024 COT - RSBU - Preslab Passed 11-1-24, preslab per approved plans. Okay to pour concrete.
11/01/2024 COT - RSEL - Electrical Underground Passed 11-1-24, approved.
11/01/2024 COT - RSEL - Grounding/Bonding Passed 11-1-24, grounding/bonding inspection per approved plans. Okay to pour concrete.
11/13/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 11-13-24, exterior clips/sheathing per approved plans. Okay to continue construction
11/13/2024 COT - RSBU - Roof Nailing Passed 11-13-24, exterior clips/sheathing and roof nailing per approved plans. Okay to continue construction
12/06/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12-6-24, residential intermediate approved. Okay to continue with construction
12/06/2024 BULD - Electrical Clearance Passed 12-6-24, panel approved for TEP to energize panel. ECO clearance issued.
12/06/2024 COT - RSPL - Gas Pressure Test Passed 12-6-24, gas pressure test verified at 15 psi.
12/18/2024 COT - RSBU - Interior Shear Bracing Passed 12/18/24 pass
02/04/2025 COT - BULD - SWG Clearance Passed 2/4/25 approval for SWG clearance.
02/13/2025 COT - RSEL - Electrical Final Passed Passed final 2/13/25 CLEARANCE ECO
02/13/2025 COT - RSEL - Outdoor Lighting Passed Passed final 2/13/25
02/13/2025 COT - RSME - Mechanical Final Passed Passed final 2/13/25
02/13/2025 COT - RSPL - Plumbing Final Passed Passed final 2/13/25
02/13/2025 ENGR Engineering Final Passed CO Ready
02/13/2025 RSBU - Building Final Passed Passed final 2/13/25
02/13/2025 RSBU - Building Progress Passed Passed final 2/13/25