Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
02/27/2024
Applicant:
Daria Hopkins
Description:
SFR MERI132021 T21-M0062

Permit Reviews

Permit Number - TC-MDP-0224-00250
Permit Status: Issued
Permit Description: SFR MERI132021 T21-M0062
Start Date Submittal Complete Date Status  
10/17/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/18/2024 APPROVED Review Details
02/29/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/11/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0224-00250
Permit Status: Issued
Permit Description: SFR MERI132021 T21-M0062
Date Description Comments
03/09/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/09/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/09/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/09/2024 Post-Installed Anchor Inspection Report is required.
03/09/2024 Post-Tension Inspection Report is required.
02/23/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/23/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
03/09/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
03/09/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0224-00250
Permit Description: SFR MERI132021 T21-M0062
Total Completed Inspections - 22
Date Description Inspector Results Comments
05/23/2024 COT - RSPL - Yard Water Line Passed
05/23/2024 COT - RSPL - Sewer Passed
05/23/2024 COT - RSPL - Rough Soil Passed
05/23/2024 COT - RSPL - Backwater Valve Passed
05/31/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
05/31/2024 COT - RSBU - Preslab Passed
05/31/2024 COT - RSEL - Electrical Underground Passed
05/31/2024 COT - RSEL - Grounding/Bonding Passed
06/28/2024 COT - RSBU - Roof Nailing Passed
07/10/2024 COT - RSBU - Exterior Clips/Sheathing Passed Corrections were made. 7/10/2024
07/26/2024 COT - RSPL - Gas Pressure Test Passed
07/29/2024 BULD - Electrical Clearance Passed TEP ECO
07/29/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/07/2024 COT - RSBU - Interior Shear Bracing Passed
10/01/2024 COT - BULD - SWG Clearance Passed PASS. SOUTHWEST GAS CLEARANCE. 10/1/2024
10/08/2024 COT - RSEL - Electrical Final Passed PASS 10/8/24
10/08/2024 COT - RSEL - Outdoor Lighting Passed PASSED 10/8/24
10/08/2024 COT - RSME - Mechanical Final Passed PASS 10/8/24
10/08/2024 COT - RSPL - Plumbing Final Passed PASS 10/8/24
10/08/2024 ENGR Engineering Final Passed
10/08/2024 RSBU - Building Final Passed PASS 10/8/24
10/08/2024 RSBU - Building Progress Passed PASS 10/8/24

Documents

File Name Document Type  
LOT 150 FINAL SIC-2024-10-12_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 150 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 150 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 150 SPECIAL INSPECTION CERTIFICATE-2024-02-27_V1.PDF DOCUMENTS VIEW