Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
02/27/2024
Applicant:
Daria Hopkins
Description:
SFR MERI132021 T21-M0062

Permit Reviews

Permit Number - TC-MDP-0224-00249
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Start Date Submittal Complete Date Status  
02/28/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/11/2024 APPROVED Review Details
10/17/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/18/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0224-00249
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Date Description Comments
03/09/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/09/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/09/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/09/2024 Post-Installed Anchor Inspection Report is required.
03/09/2024 Post-Tension Inspection Report is required.
02/23/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/23/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
03/09/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
03/09/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0224-00249
Permit Description: SFR MERI132021 T21-M0062
Total Completed Inspections - 21
Date Description Inspector Results Comments
06/14/2024 COT - RSPL - Yard Water Line Passed
06/14/2024 COT - RSPL - Sewer Passed
06/14/2024 COT - RSPL - Rough Soil Passed
06/27/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
06/27/2024 COT - RSBU - Preslab Passed
06/27/2024 COT - RSEL - Electrical Underground Passed
06/27/2024 COT - RSEL - Grounding/Bonding Passed
07/17/2024 COT - RSBU - Exterior Clips/Sheathing Passed
07/17/2024 COT - RSBU - Roof Nailing Passed
08/12/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/12/2024 COT - RSPL - Gas Pressure Test Passed
08/12/2024 BULD - Electrical Clearance Passed TEP ECO
08/22/2024 COT - RSBU - Interior Shear Bracing Passed
10/09/2024 COT - BULD - SWG Clearance Passed 10/9/24 Southwest gas clearence
10/24/2024 COT - RSEL - Electrical Final Passed 10-24-24 electrical final approved.
10/24/2024 COT - RSEL - Outdoor Lighting Passed 10-24-24 Outdoor lighting approved.
10/24/2024 COT - RSME - Mechanical Final Passed 10-24-24 mechanical final approved.
10/24/2024 COT - RSPL - Plumbing Final Passed 10-24-24 plumbing final approved.
10/25/2024 ENGR Engineering Final Passed
10/24/2024 RSBU - Building Final Passed 10-24-24, building final approved.
10/24/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 142 FINAL SIC-2024-10-12_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 142 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 142 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 142 SPECIAL INSPECTION CERTIFICATE-2024-02-27_V1.PDF DOCUMENTS VIEW