Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
4774 E JULIAN WASH DR
Apply Date:
03/25/2024
Applicant:
Dana Petty
Description:
SFR MERI132021 T21-M0062

Permit Reviews

Permit Number - TC-MDP-0224-00248
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Start Date Submittal Complete Date Status  
03/25/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 04/02/2024 APPROVED Review Details
10/17/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/18/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0224-00248
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Date Description Comments
03/26/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/26/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/26/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/26/2024 Post-Tension Inspection Report is required.
02/23/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/23/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
03/26/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
03/26/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0224-00248
Permit Description: SFR MERI132021 T21-M0062
Total Completed Inspections - 21
Date Description Inspector Results Comments
08/05/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 8/5/2024
08/05/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 8/5/2024
08/05/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 8/5/2024
08/09/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/09/2024 COT - RSBU - Preslab Passed
08/09/2024 COT - RSEL - Electrical Underground Passed
08/09/2024 COT - RSEL - Grounding/Bonding Passed
08/21/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
08/21/2024 COT - RSBU - Roof Nailing Passed
09/18/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/18/2024 COT - RSPL - Gas Pressure Test Passed
09/18/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 9/18/2024
10/01/2024 COT - RSBU - Interior Shear Bracing Passed Pass 10/1/2024
11/15/2024 COT - BULD - SWG Clearance Passed 11-15-24, approved for Southwest gas connection.
11/27/2024 COT - RSEL - Electrical Final Passed 11-27-24, outdoor lighting, electric, plumbing, mechanical, and building finals are all approved.
11/27/2024 COT - RSEL - Outdoor Lighting Passed 11-27-24, outdoor lighting, electric, plumbing, mechanical, and building finals are all approved.
11/27/2024 COT - RSME - Mechanical Final Passed 11-27-24, outdoor lighting, electric, plumbing, mechanical, and building finals are all approved.
11/27/2024 COT - RSPL - Plumbing Final Passed 11-27-24, outdoor lighting, electric, plumbing, mechanical, and building finals are all approved.
11/27/2024 ENGR Engineering Final Passed
11/27/2024 RSBU - Building Final Passed 11-27-24, outdoor lighting, electric, plumbing, mechanical, and building finals are all approved.
11/27/2024 RSBU - Building Progress Passed 11-27-24, outdoor lighting, electric, plumbing, mechanical, and building finals are all approved.