Permit: TC-MDP-0224-00248
Permit Details
Apply Date:
03/25/2024
Applicant:
Daria Hopkins
Description:
SFR MERI132021 T21-M0062
Permit Reviews
Permit Number - TC-MDP-0224-00248
Permit Status: Inspections complete
Permit Description: SFR MERI132021 T21-M0062
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/25/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/02/2024 | APPROVED |
10/17/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/18/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0224-00248
Permit Status: Inspections complete
Permit Description: SFR MERI132021 T21-M0062
Date | Description | Comments |
---|---|---|
03/26/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
03/26/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
03/26/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
03/26/2024 | Post-Tension Inspection Report is required. | |
02/23/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/23/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
03/26/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
03/26/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0224-00248
Permit Description: SFR MERI132021 T21-M0062
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/05/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 8/5/2024 | |
08/05/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 8/5/2024 | |
08/05/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 8/5/2024 | |
08/09/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
08/09/2024 | COT - RSBU - Preslab | Passed | ||
08/09/2024 | COT - RSEL - Electrical Underground | Passed | ||
08/09/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
08/21/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
08/21/2024 | COT - RSBU - Roof Nailing | Passed | ||
09/18/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
09/18/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/18/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 9/18/2024 | |
10/01/2024 | COT - RSBU - Interior Shear Bracing | Passed | Pass 10/1/2024 | |
11/15/2024 | COT - BULD - SWG Clearance | Passed | 11-15-24, approved for Southwest gas connection. | |
11/27/2024 | COT - RSEL - Electrical Final | Passed | 11-27-24, outdoor lighting, electric, plumbing, mechanical, and building finals are all approved. | |
11/27/2024 | COT - RSEL - Outdoor Lighting | Passed | 11-27-24, outdoor lighting, electric, plumbing, mechanical, and building finals are all approved. | |
11/27/2024 | COT - RSME - Mechanical Final | Passed | 11-27-24, outdoor lighting, electric, plumbing, mechanical, and building finals are all approved. | |
11/27/2024 | COT - RSPL - Plumbing Final | Passed | 11-27-24, outdoor lighting, electric, plumbing, mechanical, and building finals are all approved. | |
11/27/2024 | ENGR Engineering Final | Passed | ||
11/27/2024 | RSBU - Building Final | Passed | 11-27-24, outdoor lighting, electric, plumbing, mechanical, and building finals are all approved. | |
11/27/2024 | RSBU - Building Progress | Passed | 11-27-24, outdoor lighting, electric, plumbing, mechanical, and building finals are all approved. |