Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
03/25/2024
Applicant:
Daria Hopkins
Description:
SFR MERI132021 T21-M0062

Permit Reviews

Permit Number - TC-MDP-0224-00248
Permit Status: Issued
Permit Description: SFR MERI132021 T21-M0062
Start Date Submittal Complete Date Status  
03/25/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/02/2024 APPROVED Review Details
10/17/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/18/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0224-00248
Permit Status: Issued
Permit Description: SFR MERI132021 T21-M0062
Date Description Comments
03/26/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/26/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/26/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/26/2024 Post-Tension Inspection Report is required.
02/23/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/23/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
03/26/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
03/26/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0224-00248
Permite Description: SFR MERI132021 T21-M0062
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/07/2024 COT - BULD - SWG Clearance N/A Re-inspection required 11-7-24, missing shutoff valve at kitchen stove. Contractor will reschedule when ready

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0224-00248
Permit Description: SFR MERI132021 T21-M0062
Total Completed Inspections - 13
Date Description Inspector Results Comments
08/05/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 8/5/2024
08/05/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 8/5/2024
08/05/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 8/5/2024
08/09/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/09/2024 COT - RSBU - Preslab Passed
08/09/2024 COT - RSEL - Electrical Underground Passed
08/09/2024 COT - RSEL - Grounding/Bonding Passed
08/21/2024 COT - RSBU - Exterior Clips/Sheathing Passed
08/21/2024 COT - RSBU - Roof Nailing Passed
09/18/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/18/2024 COT - RSPL - Gas Pressure Test Passed
09/18/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 9/18/2024
10/01/2024 COT - RSBU - Interior Shear Bracing Passed Pass 10/1/2024

Documents

File Name Document Type  
LOT 137 FINAL SIC-2024-10-12_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 137 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 137 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 137 SPECIAL INSPECTION CERTIFICATE-2024-03-25_V1.PDF DOCUMENTS VIEW