Permit: TC-MDP-0224-00247
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
4786 E JULIAN WASH DR
Address NEW:
4786 E JULIAN WASH DR
Apply Date:
03/05/2024
Applicant:
Dana Petty
Description:
SFR MERI132021 T21-M0062
Permit Reviews
Permit Number - TC-MDP-0224-00247
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/17/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/18/2024 | APPROVED |
| 03/05/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 03/18/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0224-00247
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
| Date | Description | Comments |
|---|---|---|
| 03/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 03/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 03/15/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 03/15/2024 | Post-Installed Anchor Inspection Report is required. | |
| 03/15/2024 | Post-Tension Inspection Report is required. | |
| 02/23/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 02/23/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 03/15/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 03/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0224-00247
Permit Description: SFR MERI132021 T21-M0062
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2024 | COT - RSPL - Backwater Valve | Passed | Okay to backfill. Shading required. 6/27/2024 | |
| 06/27/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 6/27/2024 | |
| 06/27/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 6/27/2024 | |
| 07/09/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 07/09/2024 | COT - RSBU - Preslab | Passed | ||
| 07/09/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 07/09/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 07/29/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 08/02/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Corrections were made. 8/2/2024 | |
| 08/19/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 08/20/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 8/20/2024 | |
| 08/20/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 08/28/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 10/28/2024 | COT - BULD - SWG Clearance | Passed | 10-28-24, approved for Southwest Gas connection. | |
| 11/01/2024 | COT - RSEL - Electrical Final | Passed | 11-1-24, building final approval. | |
| 11/01/2024 | COT - RSEL - Outdoor Lighting | Passed | 11-1-24, building final approval. | |
| 11/01/2024 | COT - RSME - Mechanical Final | Passed | 11-1-24, building final approval. | |
| 11/01/2024 | COT - RSPL - Plumbing Final | Passed | 11-1-24, building final approval. | |
| 11/01/2024 | COT - RSPL - Yard Water Line | Passed | 11-1-24, approved. | |
| 11/01/2024 | ENGR Engineering Final | Passed | ||
| 11/01/2024 | RSBU - Building Final | Passed | 11-1-24, building final approval. | |
| 11/01/2024 | RSBU - Building Progress | Passed |