Permit: TC-MDP-0224-00243
Permit Details
Apply Date:
05/07/2024
Applicant:
John Hodge
Description:
PULT3519-3 T21-M0048 SFR
Permit Reviews
Permit Number - TC-MDP-0224-00243
Permit Status: Issued
Permit Description: PULT3519-3 T21-M0048 SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/07/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/14/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0224-00243
Permit Status: Issued
Permit Description: PULT3519-3 T21-M0048 SFR
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
02/21/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
05/10/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0224-00243
Permit Status: Issued
Permit Description: PULT3519-3 T21-M0048 SFR
Date | Description | Comments |
---|---|---|
05/10/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
05/10/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/10/2024 | Post-Tension Inspection Report is required. | |
02/21/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
05/10/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0224-00243
Permit Description: PULT3519-3 T21-M0048 SFR
Total Completed Inspections - 12
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/24/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 6/24/2024 | |
06/24/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 6/24/2024 | |
06/27/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/27/2024 | COT - RSBU - Preslab | Passed | ||
06/27/2024 | COT - RSEL - Electrical Underground | Passed | ||
07/31/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/31/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
09/10/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 9/10/2024 | |
09/10/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made. 9/10/2024 | |
09/13/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/26/2024 | COT - RSBU - Interior Shear Bracing | Passed | PASS 9/26/2024 | |
11/08/2024 | COT - BULD - SWG Clearance | Passed | Pass. Ok for meter. |