Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0224-00242
Permit Details
Apply Date:
04/03/2024
Applicant:
John Hodge
Description:
PULT3519-3 T21-M0048 SFR
Permit Reviews
Permit Number - TC-MDP-0224-00242
Permit Status: Inspections complete
Permit Description: PULT3519-3 T21-M0048 SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/04/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/09/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0224-00242
Permit Status: Inspections complete
Permit Description: PULT3519-3 T21-M0048 SFR
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
02/21/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
04/04/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
04/04/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
04/04/2024 | Post-Tension Inspection Report is required. |
04/04/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
04/04/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0224-00242
Permit Status: Inspections complete
Permit Description: PULT3519-3 T21-M0048 SFR
Date | Description | Comments |
---|---|---|
02/21/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0224-00242
Permit Description: PULT3519-3 T21-M0048 SFR
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/10/2024 | COT - RSPL - Rough Soil | Passed | ||
06/10/2024 | COT - RSPL - Sewer | Passed | ||
06/18/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/18/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
06/18/2024 | COT - RSEL - Electrical Underground | Passed | ||
06/20/2024 | COT - RSBU - Preslab | Passed | ||
07/29/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
07/29/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/31/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
08/16/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
08/19/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made. 8/19/2024 | |
11/07/2024 | COT - BULD - SWG Clearance | Passed | 11-7-24, approved for Southwest Gas connection. | |
11/14/2024 | ENGR Engineering Final | Passed | Landscape in progress, please reschedule | |
11/14/2024 | COT - RSBU - Interior Shear Bracing | Passed | 11-14-24, contractor states that inspection was made, and approved. Drywall already taped and textured. | |
11/18/2024 | COT - RSEL - Electrical Final | Passed | ||
11/18/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
11/18/2024 | COT - RSME - Mechanical Final | Passed | ||
11/18/2024 | COT - RSPL - Yard Water Line | Passed | ||
11/18/2024 | RSBU - Building Progress | Passed | ||
11/19/2024 | COT - RSPL - Plumbing Final | Passed | 11-19-24, listed items from previous inspections have been corrected. Final approved. | |
11/19/2024 | RSBU - Building Final | Passed | 11-19-24, listed items from previous inspections have been corrected. Final approved. |