Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0224-00234
Permit Details
Apply Date:
02/20/2024
Applicant:
Stephanie Bebee
Description:
SFR CVPLAN2.5 T22-M0062 V2
Permit Reviews
Permit Number - TC-MDP-0224-00234
Permit Status: Issued
Permit Description: SFR CVPLAN2.5 T22-M0062 V2
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/17/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/21/2024 | APPROVED |
03/13/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 03/22/2024 | APPROVED |
07/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/26/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0224-00234
Permit Status: Issued
Permit Description: SFR CVPLAN2.5 T22-M0062 V2
Date | Description | Comments |
---|---|---|
03/22/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
03/22/2024 | Post-Tension Inspection Report is required. | |
02/20/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/20/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
03/22/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0224-00234
Permite Description: SFR CVPLAN2.5 T22-M0062 V2
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/22/2024 | COT - RSBU - Exterior Clips/Sheathing | N/A | Re-inspection required | 5/22/24: missing rsp clips and shear wall |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0224-00234
Permit Description: SFR CVPLAN2.5 T22-M0062 V2
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/09/2024 | COT - RSPL - Yard Water Line | Passed | ||
04/09/2024 | COT - RSPL - Sewer | Passed | ||
04/09/2024 | COT - RSPL - Rough Soil | Passed | ||
04/15/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
04/15/2024 | COT - RSBU - Preslab | Passed | ||
04/15/2024 | COT - RSEL - Electrical Underground | Passed | ||
04/15/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
05/22/2024 | COT - RSBU - Roof Nailing | Passed | ||
05/24/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
06/25/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
07/10/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
07/10/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
07/26/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall on interior shear walls is properly installed and secured to the studs per plan requirements. Okay to proceed with drywall tape, texture, and paint on ceilings and walls. | |
10/15/2024 | RSBU - Building Progress | Passed | 10/15/24 pass | |
10/15/2024 | RSBU - Building Final | Passed | 10/15/24 pass | |
10/15/2024 | COT - RSPL - Plumbing Final | Passed | 10/15/24 pass | |
10/15/2024 | COT - RSME - Mechanical Final | Passed | 10/15/24 pass | |
10/15/2024 | COT - RSEL - Outdoor Lighting | Passed | 10/15/24 pass | |
10/15/2024 | COT - RSEL - Electrical Final | Passed | 10/15/24 pass | |
10/15/2024 | COT - BULD - SWG Clearance | Passed | 10/15/24 pass |